background image

Page 6

Vectaire Ltd, Lincoln Road, Cressex Business Park, High Wycombe, Buckinghamshire, HP12 3RH

Tel: +44 (0)1494 522333.  Fax: +44 (0)1494 522337.  Email: [email protected]

WHHR100/90DC-B Plus-Oct 2014

E & O.E

Содержание WHHR100DC-B Plus

Страница 1: ...WHHR100 90DC B Plus Whole House Heat Recovery Unit with Low Energy DC Motor for domestic and commercial use Installation Operating and Maintenance Instructions...

Страница 2: ...nt avoiding the use of excessive energy and saving heat already generated The heat recovery unit will generally be installed in the loft of a house or the void above the ceiling in an apartment but ma...

Страница 3: ...le the unit should NOT be installed directly above a bedroom or living room The condensation drain must be fitted and if insulated use the equivalent of at least 25mm of insulating material with a the...

Страница 4: ...5mm of insulating material with a thermal conductivity of 0 04 W mK The pipe must drain into the normal household drainage system The drain must incorporate a wet or dry trap to prevent air penetratio...

Страница 5: ...esign value If incorrect adjust as follows Turn the electrical supply off Remove the cover of the electrical control panel Adjust the potentiometer marked min up or down as required See page 6 Turn on...

Страница 6: ...Page 6 Vectaire Ltd Lincoln Road Cressex Business Park High Wycombe Buckinghamshire HP12 3RH Tel 44 0 1494 522333 Fax 44 0 1494 522337 Email sales vectaire co uk WHHR100 90DC B Plus Oct 2014 E O E...

Страница 7: ...WHHR100 90DC B Plus Bypass models Whole House Heat Recovery Unit with Low Energy DC Motor for domestic and commercial use Installation Operating and Maintenance Instructions...

Страница 8: ...lthy environment avoiding the use of excessive energy and saving heat already generated The heat recovery unit will generally be installed in the loft of a house or the void above the ceiling in an ap...

Страница 9: ...ssible the unit should NOT be installed directly above a bedroom or living room The condensation drain must be fitted and if insulated use the equivalent of at least 25mm of insulating material with a...

Страница 10: ...5mm of insulating material with a thermal conductivity of 0 04 W mK The pipe must drain into the normal household drainage system The drain must incorporate a wet or dry trap to prevent air penetratio...

Страница 11: ...am A green light will appear on the circuit board 3 With the boost switch OFF bathroom light switch off measure the airflow rate at the extract valve and compare this to the design value If there is a...

Страница 12: ...valve Boost speed l h drainage 6 Switch on the boost light switch ON 7 Measure the airflow rate at the extract valve and compare this to the design value If there is a difference adjust the potentiom...

Страница 13: ...ain access panel Remove the rubber inserts from the filter slots where fitted and slide out the filters from the internal mouldings Clean the filters carefully using a vacuum cleaner and refit Replace...

Отзывы: