43
GETTING TO KNOW YOUR EVS-2000
2.5 Main Board Jumper Settings
2.5.1 Board Top View of EVS-2000 Main Board with Jumper and DIP Switch
The figure below is the top view of EVS-2000 main board which is the main
board. It shows the location of the jumpers and the switches.
You may configure your card to match the needs of your application by setting
jumpers. A jumper is a metal bridge used to close an electric circuit. It consists
of two metal pins and a small metal clip (often protected by a plastic cover) that
slides over the pins to connect them. To "close" a jumper, you connect the pins
with the clip. To "open" a jumper, you remove the clip. Sometimes a jumper will
have three pins, labeled 1, 2 and 3. In this case you would connect either pins 1
and 2, or 2 and 3.
1
22
21
2
1
JRI_PWR1
JRI_PWR2
JIGNMODE1 SW2
JP4
JCMOS1
JUSBPWR1
JHDA_SDO1
Closed
Closed 2-3
1
2 3
Open
Содержание EVS-2000 Series
Страница 59: ...52 SYSTEM SETUP Vecow EVS 2000 User Manual Step 3 Remove six F M3x4L screws Step 4 Take off the bottom cover...
Страница 60: ...53 SYSTEM SETUP Step 5 Finish...
Страница 62: ...55 SYSTEM SETUP Step 1 2 Remove fan module header Step 1 3 Remove six I M3x6L screws...
Страница 64: ...57 SYSTEM SETUP Step 5 Installing CPU on the slot and remove the mylar Step 6 Cover and lock the CPU socket...
Страница 66: ...59 SYSTEM SETUP Step 9 Fasten four I M3x6L screws...
Страница 70: ...63 SYSTEM SETUP 3 5 2 Key B 3042 Step 1 Install M 2 card into the M 2 slot Step 2 Fasten one PH M3x4L screw...
Страница 73: ...66 SYSTEM SETUP Vecow EVS 2000 User Manual Step 3 Fasten washer on the antenna cable connector...
Страница 77: ...70 SYSTEM SETUP Vecow EVS 2000 User Manual Step 3 Installing PCI PCIe card and fasten M3x5L screws...
Страница 79: ...72 SYSTEM SETUP Vecow EVS 2000 User Manual Step 4 Installing SSD HDD Step 3 Finish...