![Vecow ECS-9210 Скачать руководство пользователя страница 62](http://html1.mh-extra.com/html/vecow/ecs-9210/ecs-9210_user-manual_3743663062.webp)
55
HARDWARE INSTALLATION
2.6.3 Smart Battery Protection
The system with “Ignition Control” can perform Smart Battery Protection, namely
Low Battery Detection.
When the system is running on a battery and its voltage drops below the
threshold, the system will automatically shut down. The Low Battery Detection is
implemented in the ignition control MCU FW and as a default function.
Battery Voltage
Thresholds
12V
10.5~15V
24V
21.5~30V
Note:
Содержание ECS-9210
Страница 64: ...57 HARDWARE INSTALLATION Step 3 Finish Step1 and 2 Step 4 Remove one cover Step 5 Open the module...
Страница 68: ...61 HARDWARE INSTALLATION Step 4 Open CPU slot Be careful CPU pins Step 3 CPU slot...
Страница 74: ...67 HARDWARE INSTALLATION 3 7 Installing PCI PCIe Card Step 2 Remove the bracket Step 1 Remove the M3 screw...
Страница 75: ...68 HARDWARE INSTALLATION Vecow ECS 9200 9100 User Manual Step 4 Fasten M3 screw Step 3 Install PCI PCIe card...
Страница 77: ...70 HARDWARE INSTALLATION Vecow ECS 9200 9100 User Manual Step 3 Finish Step 4 Install SSD HDD...
Страница 78: ...71 HARDWARE INSTALLATION 3 9 Installing M 2 Step 2 Fasten one M3 screws Step 1 M 2 slot...
Страница 80: ...73 HARDWARE INSTALLATION Step 4 Lock two M2 screws with slot Step 3 Install M2DOM module with slot...
Страница 82: ...75 HARDWARE INSTALLATION Step 2 Fasten 4pcs KHS 6 32 screws then finish...