12
to ensure natural thermal convection. Please see Figure
2-1: Mounting.
CAUTION: If the controller is to be installed in an enclosed box,
it is important to ensure reliable heat dissipation through the box.
Step 2
:
Connect the system in the order of
❶
battery
❷
load
❸
PV array in accordance with Figure 2-
2,”Schematic Wiring Diagram” and disconnect the system
in the reverse order
❸❷❶
.
CAUTION:
While wiring the controller do not close the circuit
breaker or fuse and make sure that the leads of "+" and "-"
poles are connected correctly.
Figure 2-2 Schematic of wiring
Содержание 1206 Series
Страница 2: ......
Страница 34: ...30 Light ON OFF Light ON Timer...
Страница 38: ...34...
Страница 50: ...46 Annex II Mechanical Dimension Diagram XTRA1206 Unit mm...
Страница 51: ...47 XTRA2206 Unit mm...
Страница 52: ...48...