Vacuum Packaging Machines 07P ...
Malfunctions
Nr. Fault
Cause
Remedy
32 CHECK
PUMP
AND/OR VACUUM
MEAS. SYSTEM
Measuring switchover valve
defective, pressing membrane of
the sealing bar not tight,
Measuring hose has loosened
itself from sensor.
Call VC999 Customer Service Dept.
34
OPEN LOOP AT
TEMPERATURE
MEAS. SENSOR
Plug not properly pushed in
(Chapter.12.4.4.1)
Cable break
Insert plug
Call VC999 Customer Service Dept.
35
SHORT CIRCUIT AT
TEMPERATURE
MEAS. SENSOR
Overheating of the sensor, short
circuit on the sensor or supply
cable.
Setting of the sealing time
adjustment too low.
Call VC999 Customer Service Dept.
Undertake a calibration of the
sealing time correction (Chapter.
12.4.4.1)
36 VACUUM
RELEASE
(VENTILATION)
MALFUNCTION
Air inlet filter blocked, Valve
defective.
Check preventilation
64
LID OPEN SWITCH
NOT ACTIVATED
65 LID
CLOSED
SWITCH NOT
ACTIVATED
End switch setting incorrect
Mechanical obstruction of
movement.
Main ventilation too slow.
End switch defective
Defect in the supply to the end
switch or valve.
Check end switch setting
Check mechanical movement
Call VC999 Customer Service Dept.
Replace end switch
Call VC999 Customer Service Dept.
66
TOP POSITION OF
PLATFORM NOT
REACHED
Position pickup defective or not
properly adjusted
Platform cylinder not working
correctly
Check cycle count in the Service
program (Chapter. 12.4.3) and
inform VC999 customer service
Dept.
67 PLATFORM
LEVEL
IS NOT
ADJUSTABLE
Position pickup defective
Position pickup incorrectly
connected
Platform cylinder not working
correctly
Check position pickup
Check connection
Call VC999 Customer Service Dept.
99 MACHINE
MALFUNCTION
NOT ANALIZED
Too low voltage supply
Check power supply
Call VC999 Customer Service Dept.
As soon as these errors occur, the corresponding text will appear at the display until they are
confirmed with the
STOP
button. The machine returns to the initial position.
Page 42/74
Art. no. 527.763
2003-11-05
Содержание 07P Series
Страница 2: ......
Страница 4: ......
Страница 37: ...Vacuum Packaging Machines 07P Operation 10 6 14 Program table 2003 11 05 Art no 527 763 Page 37 74...
Страница 67: ...Vacuum Packaging Machines 07P Pneumatics diagram 17 Pneumatics diagram 2003 11 05 Art no 527 763 Page 67 74...
Страница 68: ...Vacuum Packaging Machines 07P Circuit diagrams 18 Circuit diagrams Page 68 74 Art no 527 763 2003 11 05...
Страница 69: ...Vacuum Packaging Machines 07P Circuit diagrams 2003 11 05 Art no 527 763 Page 69 74...
Страница 70: ...Vacuum Packaging Machines 07P Circuit diagrams Page 70 74 Art no 527 763 2003 11 05...
Страница 71: ...Vacuum Packaging Machines 07P Circuit diagrams 2003 11 05 Art no 527 763 Page 71 74...
Страница 72: ...Vacuum Packaging Machine 07P Sequence diagram 19 Sequence diagram Page 72 74 Art no 527 763 2003 11 05...