13
7.3.3 Place the duct pipes in the unibody
NOTICE
The lower duct pipe is the condensate drain and
needs to be water tight
. Apply PVC glue to
the last 3 cm of the duct pipe and to the white ring inside the socket of the unibody. Make
an airtight connection: the air in the ducts can be very cold. No warm, moist indoor air may
reach the cold ducts.
1.
Put PVC glue on the white ring which is located on the inside of the stale air output
socket (see
fig. 8
). Do not put PVC glue on the fresh air input tube.
fig. 8
Put PVC glue in the stale air output socket on the white ring only
2. Place the duct pipes into the unibody.
Make sure the lips are pointed towards the bottom side of the unibody.
These are needed to mate with the outside wall grills.
fig. 9
Put PVC glue in the stale air output socket on the white ring only
3. To continue the installation, go to chapter 8 (page 20) and skip paragraph 7.4.
NO PVC glue
PVC glue
Содержание Fresh-r
Страница 2: ...2 ...
Страница 23: ...23 fig 26 Mount the brackets on the wall 4 times ...
Страница 43: ...43 16 1 2 Wall cut out 1 Dimensions are in mm Dimensions in brackets are in inches ...
Страница 44: ...44 16 1 3 Wall cut out 2 Dimensions are in mm Dimensions in brackets are in inches ...
Страница 48: ...48 16 2 4 Dimensions for prepatating the wall for extract ducts ...
Страница 50: ...50 ...
Страница 51: ...51 ...
Страница 52: ...www fresh r eu 2017 by Vaventis B V All right reserved ...