11
To drill the
lower
hole
(130 mm)
, do the following:
1.
Drill through the outer wall(s) at a downward angle of 2 degrees (see
fig. 5
).
This will allow the condensate to drain towards outside.
To drill the
upper
hole
(130 mm)
, do the following:
2. Drill straight through the outer wall.
3. Remove dust and other materials from the holes.
4.
Get a duct pipe (this is the blue PVC pipe) and try if it fits in the holes.
A
A
Section cut AA
inner-wall
outer-wall
fig. 5
Position of the two holes
130 ± 2 mm
897± 2 mm
128 ± 2 mm
186± 2 mm
130 ± 2 mm
2
0
Содержание Fresh-r
Страница 2: ...2 ...
Страница 23: ...23 fig 26 Mount the brackets on the wall 4 times ...
Страница 43: ...43 16 1 2 Wall cut out 1 Dimensions are in mm Dimensions in brackets are in inches ...
Страница 44: ...44 16 1 3 Wall cut out 2 Dimensions are in mm Dimensions in brackets are in inches ...
Страница 48: ...48 16 2 4 Dimensions for prepatating the wall for extract ducts ...
Страница 50: ...50 ...
Страница 51: ...51 ...
Страница 52: ...www fresh r eu 2017 by Vaventis B V All right reserved ...