14
5 Mount the Unibody on the wall
1.
Remove the four corner bolts (don’t remove the middle bolts).
fig. 16 Remove the four corner bolts
2. Put expanding foam around the edge of both EPP covers. Make sure the expanding
foam insulate the whole edge of the EPP covers in order to prevent air leaking
(regarding the inner wall).
fig. 17 Put expanding foam around the edge of both EPP covers.
3. Place the Unibody in vertical position and open the door as far as possible.
4. Press the two storm flap levers to ensure they are open.
DON’T remove the
two middle bolts
Remove the four
corner bolts
Содержание fresh-r everywhere On-The-Wall
Страница 9: ...9 fig 6 Check the dimensions of the corner holes before drilling 243 mm 105 mm 111 mm 1055 mm...
Страница 19: ...19 fig 25 Lip should overlap with the edge of the grilles...
Страница 27: ...27 15 Appendix 15 1 Technical drawings 15 1 1 fresh r Dimensions are in mm Dimensions in brackets are in inches...
Страница 28: ...28 15 1 2 fresh r with rectangular duct on top Dimensions are in mm Dimensions in brackets are in inches...
Страница 29: ...29 15 1 3 Outer wall template Dimensions are in mm Dimensions in brackets are in inches...
Страница 33: ...33...
Страница 34: ...34...
Страница 35: ...35...
Страница 36: ...www vaventis com 2015 by Vaventis B V All right reserved...