Vaughn TOP PERFORMER PLUS Скачать руководство пользователя страница 3

 

GENERAL INFORMATION 

 

PLEASE READ INSTRUCTIONS CAREFULLY BEFORE INSTALLING 

WATER HEATER 

 

1. 

Vaughn  Thermal  Corporation  (herein  called  the  Company)  intends 
that  this  TOP  PERFORMER  INDIRECT  FIRED  WATER  HEATER 
be used as a separate zone to a heating system boiler.  

 

The Company specifically does not expressly or impliedly warrant 
the merchantability or the fitness for any particular purpose or the 
performance of the heater within that system, nor does it assume 
liability for any consequential damage to general property or other 
components of the system.  

 
2. 

This  appliance  is  designed  to  heat  water  by  circulating  water  from 
the boiler through the internal coil in the tank. We specifically do not 
warrant  this  tank  for  high  temperature  applications  such  as  wood 
stoves  or  steam  producing  systems.  Such  use  of  this  product  will 
automatically void the warranty.  

 
 

The design anticipates the proper installation and care in use of 

the product. There is risk of property damage and personal injury 
inherent in the use of any hot water system. The Company cannot 
supervise the installation and therefore makes it a specific condition of 
the warranty that the customer will supervise the installation and use of 
this product to be sure they are performed in accordance with these 
instructions, as well as safe industry guidelines and proper local or 
national codes.  
 
 

Generalized instructions and procedures cannot anticipate all 

situations. For this reason, only qualified installers should perform the 
installation. A qualified installer is a licensed person who has appropriate 
training and a working knowledge of the applicable codes, regulations, 
tools, equipment and methods necessary for safe installation of a boiler 
system and an indirect water heater. 
 
 

An installation checklist has been provided to help the customer 

ensure that all procedures for a safe installation have been followed.  
 
 

If questions regarding installation arise, check with your local 

plumbing and electrical inspectors for proper procedures and codes. 
Local codes take precedence over instructions in this manual.

Содержание TOP PERFORMER PLUS

Страница 1: ...Operation and Installation Manual TOP PERFORMER PLUS Indirect Fired Water Heater Limited Warranty and Tank Replacement...

Страница 2: ...heaters will absorb less than 200 000 BTU hr when domestic water outlet temperature is 194 F and boiler water supply temperature is 240 F Listed outputs are based on ASME Section VIII Interpretation V...

Страница 3: ...ere is risk of property damage and personal injury inherent in the use of any hot water system The Company cannot supervise the installation and therefore makes it a specific condition of the warranty...

Страница 4: ...Diagram 5 ___________________________________________ 13 FIGURE 1_____________________________________________________ 14 FIGURE 2_____________________________________________________ 14 FIGURE 3____...

Страница 5: ...foundation in a clean dry location nearest the boiler The heater should be protected from freezing and water lines should be insulated to reduce energy and water waste Leave sufficient headroom to ser...

Страница 6: ...he requirements for Relief Valves and Automatic Gas Shutoff for Hot Water Supply Systems ANSI Z21 22 1971 This valve must be marked with maximum set pressure not to exceed the marked maximum allowable...

Страница 7: ...the other Thread the bolt into the nut and tighten in proper order See Figure 4 NOTE Be sure to place bolts in all of the openings WARNING Plastic o ring housing must be installed properly See Figure...

Страница 8: ...Supply Line from the boiler to the HX in fitting and Boiler Return Line to the boiler to the HX Out fitting H FILLING THE HEATER Check that the temperature and pressure relief valve has been properly...

Страница 9: ...ect 24VAC Power From the the switching relay board or from a step down transformer to the screws to the right of the Probe Connector See Thermostat Diagram 5 K TPI WIRING CONTROLS NOTE THE TPI THERMOS...

Страница 10: ...oper installation will present potential hazard to life and property Check to be sure that proper relief valve requirements are met T P installed as shown in Figures 1 and 2 See Figure 3 for S70DTPP 3...

Страница 11: ...trol temperature properly without any notice and therefore should be tested periodically for your protection DANGER IF YOU DISCOVER EXTREME HOT WATER COMING FROM THE FAUCET IMMEDIATELY SHUT OFF THE MA...

Страница 12: ...ee Thermostat Diagram 1 NOTE Markings on slide are approximate Check temperature at faucet to ensure safe operating temperature 4 Adjust left side lever to the desired differential The thermostat will...

Страница 13: ...ger Consists of two copper tubes one inside the other wound into a coil The outer tube is soldered into the brass fitting that mates into the tank The inner tube is soldered into the brass fitting tha...

Страница 14: ...11 Thermostat Diagram 1 Thermostat Diagram 2...

Страница 15: ...12 Thermostat Diagram 3 ETC101 Low Voltage Only Red Circuit Board TPI Green Circuit Board OUTPUT CONTACTS 24V IN...

Страница 16: ...and push wires Down into holes in top of connector This can also be done one side at a time 4 C Tug on each wire to make sure they are secure Wires Buttons Thermostat Diagram 5 Typical Wiring Wiring w...

Страница 17: ...14 FIGURE 1 Installation Diagram Using Zone Valves FIGURE 2 Installation Diagram Using Separate Circulator...

Страница 18: ...15 FIGURE 3 S70DTPP Installation Diagram Using a Single Tank S70DTPP Installation Diagram Including One Hotstow Storage Tank...

Страница 19: ...16 FIGURE 4...

Страница 20: ...If neither action has solved your problem please have your plumbing contractor contact us for assistance CUSTOMER RELATIONS DEPARTMENT General vaughncorp com 978 462 6683 VAUGHN THERMAL CORPORATION 26...

Страница 21: ...ANUFACTURED DATE INDICATED BY THE SERIAL NUMBER ON THE TOP PERFORMER COVERAGE Replacement policy covers only the storage tank for leaks caused by the corrosive effects of water under normal and proper...

Страница 22: ...and limitations 1 The Top Performer must be correctly installed according to the installation manual provided with the unit and all applicable local and national codes 2 The unit must be operated wit...

Страница 23: ...n should be noted At time of installation and retained for Future reference Model No Serial No Date Installed Dealer s Name Address City State Zip 26 Old Elm Street P O Box 5431 Salisbury MA 01952 543...

Страница 24: ...Warranty on newly purchased tanks Not available on replacement tanks may be purchased by completing and returning this form to Vaughn Thermal Corporation along with a payment of 199 within 30 days of...

Отзывы: