5. Installing the Equipment: Wall Mount
Smart Plus (PHT-35LHS) Installation Manual
67
En
glis
h
Combining the Equipment with the Anchor Bolts
1. Put the aligning plate on the floor and ensure that all anchored bolts come
through the holes on the plate.
2. Put the equipment in a vertical position slowly while holding the upper handle as
shown in the figure.
Be careful not to damage the cables before erecting the
equipment. Keep them clear of the equipment.
Содержание Smart Plus PHT-35LHS
Страница 1: ...Installation manual Model PHT 35LHS Version 1 29 English...
Страница 2: ......
Страница 113: ...9 Installing Software Smart Plus PHT 35LHS Installation Manual 107 English 3 Click Finish to exit the wizard...
Страница 148: ...Appendix A 2 Smart Plus PHT 35LHS Installation Manual Schematic Diagram Components Supplied...
Страница 162: ...Appendix A 16 Smart Plus PHT 35LHS Installation Manual Intentionally left blank...
Страница 164: ......
Страница 165: ...www vatech com...