
3. Before Installing the System
24
Smart Plus (PHT-35LHS) Installation Manual
3.2
Checking the ShockWatch and TiltWatch Indicators
This equipment is carefully inspected and packed before shipment. Nevertheless, the
recipient of this equipment should perform a visual inspection of all packages before
opening them to ensure that the equipment has not been damaged during shipping.
The installers and supervisors should check the status
indicators on each package before opening the package.
The ShockWatch and TiltWatch indicators turn red if the
package had mechanical shock or impact during
transportation. However, the red indicator does not
exactly mean that the equipment has been damaged.
These indicators are affixed only to the main box, which
contains the equipment since it is susceptible to external
impacts.
Check the followings before opening each package:
1.
The
ShockWatch
and
TiltWatch
indicators are affixed only to the main box,
which contains the equipment since it is susceptible to external impacts.
2.
Visually inspect the package for damage.
3.
Locate the
ShockWatch
and
TiltWatch
indicators and check if they have been
activated.
DO NOT open the package if you find either
ShockWatch
and
TiltWatch
indicators are activated. Please contact your
VATECH
service representative for assistance.
Tilt Watch
Shock Watch
Содержание Smart Plus PHT-35LHS
Страница 1: ...Installation manual Model PHT 35LHS Version 1 29 English...
Страница 2: ......
Страница 113: ...9 Installing Software Smart Plus PHT 35LHS Installation Manual 107 English 3 Click Finish to exit the wizard...
Страница 148: ...Appendix A 2 Smart Plus PHT 35LHS Installation Manual Schematic Diagram Components Supplied...
Страница 162: ...Appendix A 16 Smart Plus PHT 35LHS Installation Manual Intentionally left blank...
Страница 164: ......
Страница 165: ...www vatech com...