4. Installing the Equipment: Base Stand (Optional)
42
vatech A9 (Model:PHT-30CSS)
Installation Manual
4. Installing the Equipment: Base Stand
(Optional)
4.1
Assembling the Base and Main Units
If you are installing the equipment on a concrete floor, go to t
4.4 Fixing the base (Optional)
and complete step 1
first.
Then return to the
4.1 Assembling the Base and Main Unit.
1. Remove bolts on the lower carrying handle using an Allen Wrench.
Required Tool
Allen Wrench
6 mm / 0.24”
Содержание PHT-30CSS
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 10: ......
Страница 20: ...1 Introduction 10 vatech A9 Model PHT 30CSS Installation Manual This page is intentionally left blank...
Страница 41: ...3 Before Installing the System vatech A9 Model PHT 30CSS Installation Manual 31 English CEPH Box Configuration...
Страница 43: ...3 Before Installing the System vatech A9 Model PHT 30CSS Installation Manual 33 English Transportation Example...
Страница 109: ...7 Setting up PC vatech A9 Model PHT 30CSS Installation Manual 99 English This page is intentionally left blank...
Страница 148: ......
Страница 150: ...Appendix A 2 vatech A9 PHT 30CSS Installation Manual Schematic Diagram Components Supplied...
Страница 162: ......