Appendix A
PaX-i Plus / Insight Installation Manual
135
4. Before Installation:
Site Check List
Yes
No
Is the room large enough?
At minimum,
with CEPH unit : 2,200 mm x 2,200 mm x 2,600 mm /
87” x 87” x 103.
Without CEPH unit : 2,200 mm x 1,400 mm x 2,600 mm / 87” x
55” x 103”
Is the door entrance wider than 800mm (32”)?
Is a radiation protection plan in place?
Does equipment and PC use same dedicated circuit?
Does the electrical input condition to installation site meet the
MEIGaN requirements?
Is the local Network IP address of clinic 192.168.33.xx?
Is compressor or air conditioner suction located right next to X-
ray Room?
Is the floor flat and level?
Is the carpet on the floor? If so, remove it.
Before Opening Boxes
Yes
No
Did delivery company carry and handle with caution?
Did installers take pictures of boxes before opening?
Did installer make sure there are not any suspicious holes or
scratches on the box?
Is the ShockWatch indicator red?
Is the TiltWatch indicator red?
Содержание PaX-i Insight
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 10: ...Table of Contents vi PaX i Plus Insight Installation Manual ...
Страница 31: ...2 Choosing an Installation Site PaX i Plus Insight Installation Manual 21 Wall mount Type ...
Страница 104: ...8 Setting up PC s Environment Variables 94 PaX i Plus Insight Installation Manual This page intentionally left blank ...
Страница 111: ...9 Installing Software PaX i Plus Insight Installation Manual 101 2 Click Next to start installation ...
Страница 112: ...9 Installing Software 102 PaX i Plus Insight Installation Manual 3 Click Finish to exit the wizard ...
Страница 128: ...9 Installing Software 118 PaX i Plus Insight Installation Manual This page intentionally left blank ...
Страница 134: ...Appendix A 124 PaX i Plus Insight Installation Manual Schematic Diagram Components Supplied ...
Страница 138: ...Appendix A 128 PaX i Plus Insight Installation Manual 4 Remove the side cover ...
Страница 150: ......
Страница 151: ......