8 / 21
4. Setup
4.1. Power Supply
Before plugging in your unit, make sure that the voltage in your area is matching the required voltage
of your Flatbeam. This unit has an auto switching PSU which offers a wide range of input voltages.
The only thing you have to do before powering up, is to check if the line voltage you are connected to
is matching the range of accepted voltages. This fixture works between 100V and 240V 50/60 Hz. All
fixtures must be powered off a switched circuit and cannot be run on a rheostat (variable resistor) or
dimmer circuit. It is even not possible to do so if the dimmer is a switch working with 0% and 100%
only. This item is designed for power linking from one flatbeam to the other. Each fixture ships with
IP65 proprietary power input cables. Each fixture ships with a power adapter to male Edison
connector.
All fixtures must be connected to circuits with a suitable Earth Ground. Depending on the application
the lighting fixture may require a different connector. Please refer to the below wire color code for
installing a new connector:
Wire
Connection
Pin
Brown
AC Live
1
Blue
AC neutral
2
Green/Yellow
AC Ground
3
4.2. Mounting
This fixture may be mounted in any safe position.
The fixture includes a mounting yoke to which a rigging clamp can be attached. You must supply your
own clamp and make sure the clamp is capable of supporting the weight of this fixture. It is
recommended to use at least 2 mounting points per fixture.
Note: There are 2 types of applications for this fixture: floor stand for up lighting and overhead use for
down lighting. If you are using this fixture for down lighting from up above you must use at least 1
safety cable/chain for each fixture in addition to the mounting brackets.
1. If hanging the fixture for over head use, then please follow below steps.
2. Block access below the work area and use suitable and stable platform when installing or
servicing the fixture.
3. Safety cables must always be used, secured through safety cable attachment. The safety
cable must be capable of holding 10 times the weight of the fixture.
4. Verify the structure can hold 10 times the weight of all to be installed fixtures. After prolonged
periods of operation, the fixture chassis may reach high temperatures. This fixture must be
mounted in a ventilated location, as it is convection cooled.