background image

9

2008-03

Vedolux 37

3.  Flue pipe, standard.
4.  Fan motor. 
 

a. long nuts, x 3.

7.  Cleaning hatch.
8.  Control for bypass damper.
9.  Firewood hatch.
10.  Ash hatch.
18.  Flue pipe straight up.
19.  Base frame with ash pan.
29.  Tool for removing turbulators.
30.  Short turbulators, x 3, in upper pipes.
31.  Long turbulators, x 2, in lower pipes.
32.  Plate in upper front edge of the combustion chamber.
33.  Inner ash hatch with secondary damper.
34.  Ceramic grate, two parts, front and rear.
35.  Combustion tunnel.
43.  Protective grating for fan.
44.  Collection chamber.

29

30

31

32

34

35

3

7

18

9

10

8

32

30

31

34

33

35

4a

4

4a

43

16

When cleaning, do not leave any remains of wood or embers on the grate.
All boiler cleaning takes place from the front.
Disconnect the power supply to the boiler before cleaning.
Rake out the ash from the combustion tunnel before each burning cycle.

Ashes may contain embers for a long time after the burning cycle, so 

keep them in a non-flammable container with a cover.
Tarring in the combustion chamber does not normally cause any prob

-

lems if the correct burning procedures are followed with an accumulator 

tank.

Cleaning the boiler

Rake out the ash from the combustion tunnel before each burn-

ing cycle.
It is normal for tar to form on the walls of the combustion cham-
ber. The tar does not need to be removed because it will burn 
off once the layer has reached a certain thickness. The tar does 

not affect the efficiency of the boiler, and the output of the boiler 

is calculated and dimensioned on the basis of the heat conver-
sion surface area in the flue ducts. The flue ducts must be 
kept clean at all times. In a cleaned boiler, less of the 
heat escapes with the flue gases. One way of telling 
whether it is time for cleaning is to check the flue gas 
thermostat. It is a good idea to clean the boiler if the flue gas 
temperature is approx. 25SDgrC higher than the temperature in 
a clean boiler.

• Open the cleaning hatch, 7.
•  Pull out the five turbulators, 30 (x 3) and 31 (x 2), using the 

tool 29. 
Clean the pipes with the pipe brush. 

When cleaning the three upper pipes, be careful not to push 

the pipe cleaner through the grating, damaging the fan. Do 
not push the pipe cleaner further than the end of the pipe. 
You can feel when you have reached the end from the differ-
ence in the amount of force needed to push the cleaner. 
Replace the turbulators.

•  Open the firewood hatch, 9, and the bypass damper, 8.

 

Remove the ash on the plate in the upper front edge of the 
combustion chamber, 32. 
There should always be a small quantity of ash on the ceramic 
grate, 34, in order to extend the service life of the grate.

•  Open the ash hatch, 10, and remove the inner ash hatch.

 

Rake out the ash from the combustion tunnel, 33, but leaving 
a protective layer of a couple of centimetres. 
Clean the chamber around the combustion tunnel. 
Close all hatches and dampers.

Chimney sweeping

After the chimney has been swept, unscrew the wingnuts on 
the front of the flue pipe, 3 and 18, and remove the cover. 
Remove soot and ash. Before restarting the boiler, remove any 
soot and ash that has fallen onto the fan and into the collection 
chamber 44.

Cleaning the fan

If necessary the fan can be removed and cleaned, You should 
handle the fan with care.

• Remove the fan connector, 16, from the boiler plug.
• Unscrew the long nuts, 4a, securing the fan.
• Clean the fan blades carefully so they keep their shape. You 

are recommended to use a paintbrush.

• Replace the fan and connect the cables.

Cleaning

34

35

35

44

19

Содержание Vedolux 37

Страница 1: ...ion operation and maintenance Vedolux 37 08 03 ver 3 RVR 0811 From serial no VB THL product no Arkelstorpsv gen 88 291 94 KRISTIANSTAD Tel 044 22 63 20 Fax 044 22 63 58 info varmebaronen se ww varmeba...

Страница 2: ...eaning All flue ducts in the boiler are cleaned from the same hatch at the front of the boiler The hatch is hinged and is opened with a single operation The flue ducts are round which means there are...

Страница 3: ...nnection fan 17 Electrical connection circulation pump for accumulator charging 18 Flue pipe straight up with socket R25 for support pipe accessory 19 Base frame accessory The manufacturer reserves th...

Страница 4: ...urface area The schematic diagram below shows the Vedolux 37 with the Aqualux and Aqualux UB accumulator tanks plus Accumulator Control 3 For more details refer to the documentation supplied with the...

Страница 5: ...draining For filling the shunt valve must be fully open Turbulators The five turbulators are installed in the flue gas pipes as shown in the diagram The purpose of the turbulators is to introduce turb...

Страница 6: ...9 20 21 22 23 24 26 15b 17b 16b 20 22 21 25 26 27 28 24 Time relay delayed cutoff 25 Overheating protection 26 Indicator showing triggered over heating protection 27 Thermometer displays the boiler te...

Страница 7: ...fter the leaves have come out then wait a few weeks before trimming and splitting the wood During these weeks the leaves wilt and draw out the moisture After another few weeks of drying the wood has 2...

Страница 8: ...d hatch followed by the bypass damper If the flue gas temperature increases you know that the firewood has ignited When the firewood has burnt and the flue gas temperature has fallen to be low 120 C t...

Страница 9: ...less of the heat escapes with the flue gases One way of telling whether it is time for cleaning is to check the flue gas thermostat It is a good idea to clean the boiler if the flue gas temperature is...

Страница 10: ...on the height difference between the highest and lowest points in the system the static head Note that the pressure in the system varies with the boiler tem perature do not add water unnecessarily The...

Страница 11: ...increased quickly before charging begins Add a control system Ceramic not correctly positioned If the boiler is new check that the ceramic has not moved during transport There is no need to remove the...

Страница 12: ...Draught hatch V 37 1 37 00 60 Handle knob 25 mm 2 28 38 00 01 Manometer 0 4 bar 1 27 38 00 03 Thermometer 0 120 C 1 38 00 30 Flue gas thermometer 50 500 C 1 44 00 02 Pipe cleaner 89 mm 2 44 00 05 Pip...

Отзывы: