Page 14
ECS 1M
2.7 POWERING UP
Before powering up the ECS 1M, attach the faceplate to
the casing of the control panel using the six screws
previously removed.
Set Selector knob to position (12).
Upon power up, the unit will test it’s display by briefly
lighting all the segments of it’s LED. Make certain that all
segments light.
Following the LED display test, the unit displays the
ambient temperature of the room.
If the temperature is not displayed, refer to the Trouble
Shooting section in the appendix of this document.
Fig. 1
One Fan (115V)
www.monitrol.com
Содержание ECS-1M
Страница 8: ...Page 8 ECS 1M www monitrol com ...
Страница 16: ...Page 16 ECS 1M Fig 4 Temperature Averaging Probe Connection Fig 3 Probes and Alarm Wiring www monitrol com ...
Страница 19: ...Page 19 Fig 6 Recommended control backup CHAPTER 2 INSTALLATION www monitrol com ...
Страница 20: ...Page 20 ECS 1M www monitrol com ...
Страница 44: ...Page 44 ECS 1M MAV ECS 1M Ver 1 01 June 2001 www monitrol com ...