Although the manufacturer has made every effort to
ensure the accuracy of the information contained
herein, this document is subject to change without
notice due to ongoing product development.
WARNING AND PRECAUTIONS
Equipment, probe failure, blown fuses and/or tripped
breakers may prove harmful to the contents of the
building. Therefore it is strongly recommended to install
backup devices and alarm or warning devices. Spare
equipment should also be available at the owner’s site.
Equipment manufactured by the manufacturer is
protected against normal line surges. High surges
caused by thunder storms or power supply equipment
may damage this equipment. For added security
against line voltage surges, it is recommended that
surge and noise suppression devices be installed at the
electrical distribution panel. Use of shielded cable for
probes is recommended for protection against
lightning. These devices are available from most
electrical supply distributors.
RECOMMENDATIONS
The manufacturer recommends that all installation
procedures described herein be performed by a
qualified electrician or installation technician.
Furthermore the manufacturer recommends to test all
the functions and equipment connected to the ECS,
including the alarm system and backup devices, after
installation, after modifications, and once a month after
that.
Fuse verification and replacement, as well as the
proper setting of control values, shall be the
responsibility of the owner of this equipment.
www.monitrol.com
Содержание ECS-1M
Страница 8: ...Page 8 ECS 1M www monitrol com ...
Страница 16: ...Page 16 ECS 1M Fig 4 Temperature Averaging Probe Connection Fig 3 Probes and Alarm Wiring www monitrol com ...
Страница 19: ...Page 19 Fig 6 Recommended control backup CHAPTER 2 INSTALLATION www monitrol com ...
Страница 20: ...Page 20 ECS 1M www monitrol com ...
Страница 44: ...Page 44 ECS 1M MAV ECS 1M Ver 1 01 June 2001 www monitrol com ...