990 CLD Autoline™ Leak Detector
DRAFT 2/2/04
3-1
Section 3. Operations
This section contains instructions for operating the 990 CLD leak detector. Due to the
universality of the instrument, specific procedures for operating the leak detector vary
according application. This section describes the features of the leak detector in detail and
provides general operating guidelines to optimize the performance of the instrument.
NOTE
Shut off the power, vent the high vacuum pump, and allow it to
stop before moving it
WARNING
Switch off the cold cathode high voltage lead before making a
connection. The cold cathode high voltage lead has a potential
of 2000 V when the MAlN POWER switch is on.
There are two types of procedures:
❑
“Required Daily Procedures” on page 3-2, which are done each time the leak
detector is used.
❑
“As-Required Procedures” on page 3-8, which are done when warranted.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com