#6/27401
48
Varian ELSD Service Manual
To replace the cooled evaporator
assembly carefully connect the ends of
evaporator tube into the optical block
and nebuliser chamber, as shown.
Reconnect the electrical and gas
connections
DO NOT TIGHTEN ANY SCREWS AT
THIS POINT AS THIS CAN DAMAGE
THE ASSEMBLY
Having positioned the evaporator
assembly, tighten the nebuliser
chamber screws. (shown in red)
This will lock the ends of the assembly
into position and guarantee the
alignment is correct.
Position the mounting bracket
underneath the evaporator assembly.
Whilst pushing the bracket and
evaporator assembly backwards,
towards the side wall of the ELSD,
tighten the evaporator assembly
screws, (shown in yellow).
This will lock the position of the
assembly to the bracket and prevent
rotation of the assembly.
Содержание 380-LC
Страница 44: ... 6 27401 40 Varian ELSD Service Manual Remove the two screws to take out and replace the gas valve ...
Страница 76: ... 6 27401 72 Varian ELSD Service Manual Figure 1 Terminal program Figure 2 Communications dialog ...
Страница 78: ... 6 27401 74 Varian ELSD Service Manual Figure 5 Selecting the HEX file Figure 6 Downloading the Program ...
Страница 79: ... 6 27401 75 Varian ELSD Service Manual Figure 7 Programming the EPROM ...
Страница 81: ... 6 27401 77 Varian ELSD Service Manual Figure 8 ELSD Device ID Terminal program Figure 9 Communications dialog ...
Страница 82: ... 6 27401 78 Varian ELSD Service Manual Figure 10 Successful Communication with Get Data command ...
Страница 83: ... 6 27401 79 Varian ELSD Service Manual Figure 11 Device ID displayed ...