![Vanair Reliant RS45 Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/vanair/reliant-rs45/reliant-rs45_installation-operation-maintenance-and-parts-manual_3361830036.webp)
SECTION 5: MAINTENANCE
RELIANT RS45 AIR COMPRESSOR
PAGE - 28
090126-OP_r0 (JAN-2018)
VANAIR MANUFACTURING, INC.
(844) VAN-SERV • www.vanair.com
8
CONTINU
E
D FROM PRE
VIOUS
PAGE:
Replace intake air filter
I
•
Co
ntinu
ed from p
revio
us pag
e...
Unscrew
wing
nut a
nd re
move it, a
lo
ng with the
washer.
Pull the
housing
cover up
war
d to
dise
ngage
from t
he
housing base.
Pull filt
er upward to
dise
ngage fr
om the base.
Discard worn filter
under pr
oper re
fuge law.
NOTE
:
If clean
ing
,
DO N
O
T
tea
r the filter me
mbrane. F
or air inlet service or r
eplacement, con
su
lt th
e Van
air
Ser
vice Depart
m
ent.
9
Rep
lace sepa
ra
to
r ele
m
en
t
•
RE
FE
RE
NC
E:
• Separato
r Elemen
t [
]
• Ele
m
ent Seal Ring [
]
I
OR
DE
R:
• Separato
r element is included with the 50
0 hour f
ull ser
vice kit no.
KI
T1359
.
For compr
essor oil drain hose location
refer to
Key
#8
of this T
able.
I
Coat sur
face of sealing ring o
n coalescer filter element
with
compressor o
il bef
ore mount
ing
in
to place.
Comp
ressor oil fill is appr
oxima
tely
four (4)
quarts.
10
Inspec
t exterior o
f front-mounted oil
cooler
•
Clear
awa
y a
ny debris from t
he cooler cores b
oth with
in
the enclosure a
nd the exter
io
r; clean if necessary.
If core be
co
mes clog
ged, use a low pre
ssur
e auxiliar
y
air
source to blow thr
ough the
fin
s f
rom inside the
canopy (arr
ow
dir
ectio
n) to clean it ou
t. The fa
n may need t
o be remo
ve
d from the
shroud in or
der to r
each
parts of th
e core.
Do not
use high p
ressure air or
a pressure
washer
.
TA
BLE 5A: ROUTINE MAINTENANCE SCHEDULE
WARNING
Be
fore
perf
orm
ing m
ainten
ance:
Shut
down m
achine
, relie
ve all sys
tem p
ressu
re an
d
lo
ck out
all powe
r, as p
er th
e Sa
fety Sectio
n of t
his
man
ual. If m
achin
e is ho
t, allow p
ackage
to co
ol bef
ore
remo
ving an
y pan
el.
N
O
TE THA
T TH
E S
YS
TE
M
CAN
BE S
TAR
TED
REMO
TE
LY
:
Always cl
early
tag th
e start-up
instrumen
tatio
n again
st
accid
ental s
ystem
. start-ups
during m
ainten
ance.
M
A
INT
ENA
NCE
INT
ERVAL
S
Hour
ly
, Ca
le
ndar
Period or Controller M
ess
age
- w
hic
hev
er
comes
fi
rs
t
After
8
Hour
s
or Daily
After In
itial
50 H
ou
rs
After 500 Hours
or
Ann
ually
KEY
TASK DESCRIPTION
ACTION TO TAK
E / REFEREN
C
E
T
AB
LE
5B: ROU
TIN
E RE
PLAC
EME
N
T KIT ORDE
R IN
FOR
M
ATION
I
KEY NO.
D
ESCRIPTION
PART NO.
Q
TY
1
Kit, Com
pres
sor Se
rv
ic
e - In
itia
l 50
Ho
urs
II
KIT
1285
1
2
Kit, Compressor L
ifet
ime
W
arranty Service - 500 Hour
s
II
KIT
1095
1
I
If wor
king
in
dust
y or di
rty
co
ndi
tions,
red
uce
th
e reco
mmen
de
d ti
me in
te
rval
s
be
tw
ee
n servi
cing
b
y
ha
lf fo
r
en
gi
ne
a
nd co
mpre
ssor o
il rep
lace
m
en
t, an
d en
gin
e an
d comp
resso
r fi
lter ser
vicing
.
II
For
det
ailed
kit
co
nt
en
t d
escrip
tion
s
re
fe
r t
o
Section 7
,
Table 7A
. Also
Refe
r to
Section 7, T
able 7A
fo
r fu
ll
repl
acem
ent
pa
rts li
sti
ng,
incl
udi
ng
sep
ar
at
e
comp
on
ent
s,
n
on
-ro
ut
ine
it
em
s,
a
nd
o
pt
ion
s.
PLEA
SE NOTE:
WHEN ORDE
RING P
A
RT
S,
INDICA
TE
MA
CHIN
E SE
RI
AL NUMBE
R
.
Содержание Reliant RS45
Страница 86: ...BLANK PAGE...
Страница 87: ...BLANK PAGE...