www.Valtir.com
18
Revision C February 2023
End Treatment Configuration (TL-3)
Notes:
1. Fill all sections except the first section with water. First section is to be upside down. Do
not use a connecting pin on the exposed end of the first section.
2. Vehicle trajectory will be biased toward the flare side of a flared configuration.
3. All sections are to have pedestals strapped to the bottom. The first section uses a short
pedestal.
End Treatment Configuration (TL-2)
Notes:
1. Fill all sections except the first section with water. Do not use a connecting pin on the
exposed end of first section.
2. Vehicle trajectory will be biased toward the flare side of a flared configuration.
Figure 10
Triton Barrier
®
(TL-2) 70 km/h [45 mph] End Treatment Placement
Figure 9
Triton Barrier
®
TL-3 100 km/h [62 mph] End Treatment
Содержание Triton Barrier TL-2
Страница 1: ......
Страница 10: ...www Valtir com 9 Revision C February 2023 Figure 2 Triton Barrier TL 3 Components...
Страница 20: ...www Valtir com 19 Revision C February 2023 Figure 11 Triton Barrier fill capacity chart...
Страница 27: ...www Valtir com 26 Revision C February 2023 Notes...
Страница 28: ......