2.4 .1 Installation stages of cabinet type systems
(with the resin tank and the salt tank in the same body)
• Set the system in the decided spot while observing the conditions under items 2.1 and 2.2.
• Introduce the connectors in the by-pass
(
See figure 6
, page 6, photo 15, 16)
• Connect the supply installation to the station by-pass
(
See figure 4, page 5)
, at the inlet with „→”
sign oriented towards the station (the treatment station is supplied with a pre-mounted by-pass sys-
tem, the two by-pass connections are with 1” with an exterior thread.
• To connect the pipes to the station by-pass you should use packing materials (teflon etc.)
• Water installation to consumers is connected to the by-pass, on the outlet with „→” sign oriented
towards the station exterior
.(
See figure 4, page 5)
• Connect the overflow outlet of the station to the sewage system by means of the purchased 12 mm
hose and 12-22 mm collars.
(
See figure 5, page 5)
• Connect the
regeneration water discharge connection
of the station to the sewage system by means
of the 12 mm hose and the 12-22 mm collars.
(
See figure 5, page 5)
• Make sure that by-pass is in by-pass position (with valves closed)
(
See figure 3, page 5)
Putting into operation:
• During the entire period of installation, the by-pass valves are closed (no water in the station).
• The connection to power supply will be achieved through the 12V transformer to be equipped.
• The control valve panel will be monitored.
• Air is discharged from the station, namely:
- Valve BNT 750 - it will be set [Stepwise Regen/Backwashing]: [Menu} is pressed and selection is
made using „▼” up to [Stepwise Regen] and press [SET/REGEN]; ---> [Backwashing]
- Valve BNT 1650 - press SET button “■” to navigate to the manual regeneration interface [MAN.
REG.] Set [MAN. REG. IMMEDIAT] and press [Menu] to start regeneration.
- A by-pass valve ½ drive is opened from the entry to the station as signalled by an arrow towards
the valve.
- It should be checked whether water flows in the wash/regeneration water discharge hose.
• The by-pass valve from the entry to the station is entirely open, as signalled by an arrow towards
the valve.
• It should be checked whether clean water flows through wash water discharge hose.
• Valve BNT 1650 - when water is clear press key “▼” several times until valve enters the service
position. If water is not clear or air is not completely removed from the bowl, and the valve proceeds
to the next regeneration stage [BRINE] press key “▼” and access [RINSE]. If water is still unclear
after the [RINSE] stage, repeat the manual regeneration cycle.
• Open the station outlet valve
• The air cushion is deflated (where provided) and taken out of the brine vessel, and the vessel is
filled with salt and 10 liters of water.
Make sure that there is a gravity flow in the hoses making the connection between overflow, the
connection for wash/regeneration water discharge and the sewage system. Make sure that hoses
are not clogged and that water in the sewage system cannot backwater there at overflow outlet and
the discharge outlet, respectively.
!
Do NOT connect the station directly to 220 V.
!
Содержание aquaPUR MIX 25
Страница 107: ...107 2 2 1 2 2 1 4 100 12 1 4 2 3 12 99 5 NaCl 2 4 2 5 service bypass 3 5 12 12 22...
Страница 118: ...118 0 3 4 7 6 Restore factory default settings SET MENIU 1 SET Load Default Press to cancel Press to confirm Valrom...
Страница 122: ...122 4 4 4 09 00 CC 07 09 00 MI 01 12T 09 00 MD 01 12T 09 00 MO 01 12T...
Страница 125: ...125 4 5 1 1 1 2 2 3 3 3 4 4 5 5 2 1 1 2 2 3 3 4 4 5 5 3 6 6 4 7 7 6 8 8 3 1 1 2 2 Valrom 3 3...
Страница 126: ...126 4 1 1 2 2 5 1 1 2 2 3 3 6 4 4 5 5 7 6 1 1 2 2 3 3 4 4 1 4 5 5 6 6 7 1 1 2 2 3 3 4 4 5 5 A...
Страница 128: ...128 Bucure ti Bd Preciziei nr 28 sector 6 Tel 021 317 38 00 E mail office valrom ro www valrom ro...