4. The underside of each ceramic rock is identi
fi
ed
by a number and a speci
fi
c protruding positioning
triangle.
Install the six rocks from left to right starting with
rock no. 1.
5. Place the glass panel in its
cavity formed by the Front
Support and the Ceramic
Platform.
Rock identi
fi
cation
Triangular hole in
ceramic base
A black discoloration may form over time at the front
bottom of the 6-rock original fuel bed; this deposit
can be burned off by running the
fi
replace on a low
to medium setting
fi
re for 30 to 45 minutes. This
discoloration is unavoidable and will re-form again.
Installation
All Rocks installed
Glass panel
installed
6. Place the left twig across the second
and third rocks from the
left
; rest its
end on the glass near the edge of the
platform as shown below.
Make sure
to leave a gap between the twig and
the fi rst rock to allow fl ame to come
up between the twig and the rock.
7. Place the right twig across the second
and third rocks from the
right
; rest its
end on the glass about 1 cm from the
edge of the platform as shown below.
Make sure to leave a gap between
the twig and the fi rst rock to allow
fl ame to come up between the twig
and the rock.
QUALIFIED
INSTALLER
32