Method C - Securing the optional spacer frame kit (5135855) with
screws.
This method is not recommended where the wall / brickwork is in poor condition or
where marble back panels / surrounds are used. See the following wire fixing section.
1.
The top rear flange of the spacer frames
has two screw locations. Mark the positions of
the two screw locations on the rear wall (See
figure 8).
2.
Remove the spacer frames from the
fireplace and place away from the work area.
3.
Drill the screw locations using a suitably
sized masonry drill bit for the wall plugs
supplied.
4.
Insert two wall plugs provided into the
holes.
5.
Insert a wood screw into each hole (See figure 1) and screw in until there is
approximately 6mm of screw protruding from the wall.
6
. Secure the spacer frames to the heater using four No.8 x 3/8 screws supplied (See
figures 9 and 1).
7.
Connect the heater to the fused spur.
8.
Carefully lift the heater and locate the slots on
the rear of the spacer frame onto the screws in
the wall. The screws can be adjusted to ensure a
tight fit. When mounting to decorative surfaces
such as wallpaper be careful not to drag the
heater down the wall as this may damage the
decorative surface.
Method D - Securing the optional spacer
frame kit (5135855) with wire.
This method recommended where the wall /
brickwork is in poor condition or where marble
back panels / surrounds are used.
1
. Secure the spacer frames to the heater using
four No.8 x 3/8 screws supplied (See figures 9
and 1).
2.
Continue with the installation from point 1 of
method B.
Page 14
©
Baxi Heating U.K. Limited 2009.
INSTALLER GUIDE
Figure 9. Fitting the spacer frame
to the heater
Figure 8. Location points
Содержание 870 hydroflame Dream
Страница 28: ... Baxi Heating U K Limited 2009 ...