68
13.3 REGULAR MAINTENANCE INSPECTION PLAN
All maintenance and servicing must be carried out by technicians authorized by
VALMAR Company.
13.4 TEST RUN
Procedure of the test run:
make sure that the mixture treating control panel is in STOP state;
make sure that the ejection hole cover is well closed;
open the cylinder cover and pour approximately 4 inches (10 cm) of
water into the cylinder;
close the cylinder cover;
press the MIXING/EXTRACTION key;
Let the machine operate for 10 seconds at the most!
The appliance is
allowed to run without ice cream mixture for 10 seconds at the
most.
press the STOP / RESET key;
place a suitable container under the ejection opening, open the opening
and empty the water out of the cylinder
13.5 CHECKING THE CONDITION AND WEAR OF THE BEATER
BLADES AND SLIDERS
Maintenance inspection
DAILY
WEEKLY
EVERY
THREE
MONTHS
ANNUALLY
Electricity connections check
X
Tightness of the screws and bolts
X
Monitoring the beater blades
X
Replacing the beater blades
X
Lubrication of bearings
X
Cooling gas check
X
BEATER BLADE
BEATER SLIDER
Содержание EASY 3 TTi
Страница 1: ...HANDLING OPERATING AND MAINTENANCE GUIDE FOR ICE CREAM PRODUCTION APPLIANCE Model EASY TTi...
Страница 2: ...2...
Страница 4: ...4 13 7 ORDERING SPARE PARTS 72...
Страница 40: ...40 2 Press the button to open the submenu 3 In submenu you can use other extraction modes...
Страница 73: ...73 Appendix A Date Working hours Date Working hours Date Working hours ALL WORKING HOURS...
Страница 74: ...74 Date Working hours Date Working hours Date Working hours ALL WORKING HOURS...
Страница 75: ...75 Date Working hours Date Working hours Date Working hours ALL WORKING HOURS...
Страница 76: ...76 Date Working hours Date Working hours Date Working hours ALL WORKING HOURS...
Страница 77: ...77 Date Working hours Date Working hours Date Working hours ALL WORKING HOURS...
Страница 78: ...78 Date Working hours Date Working hours Date Working hours ALL WORKING HOURS...