Center Pivot 7000, 8000, 8120 Series 89
MAINTENANCE
Span Flushing Procedure
3. Remove the pipe drains at each drive unit tower.
Clean sand and foreign particles from these
drains. Turn the rubber drain seal over when
reinstalling. See Figure 89-1.
NOTE
• The rubber drain seals should be turned over
when being reinstalled. This practice helps to
increase the seal life.
4. Remove and clean the sand trap at the last regu-
lar drive unit. See Figure 89-2.
5. Remove plugs from the overhang drains. Clean
sand and foreign particles from these drains.
Turn the rubber drain seal over when reinstall-
ing. See Figure 89-3.
6. Start the pump and allow the machine to flush
thoroughly.
NOTE
• After flushing for winterization, ensure the
water has been allowed to drain completely
before replacing the pipe drains and plugs to
prevent freezing and splitting of the pipeline.
7. Turn off the water supply and re-install the pipe
drains, sand trap and overhang plugs.
1
2
Figure 89-1 1. Pipe Drain
2. Rubber Seal
1
Figure 89-2 1. Sand Trap
1
Figure 89-3 1. Sand Trap
Содержание Center Pivot 7000 Series
Страница 2: ...2 Center Pivot 7000 8000 8120 Series ...
Страница 18: ...18 Center Pivot 7000 8000 8120 Series SAFETY Safety Decals WARNING WARNING WARNING WARNING ...
Страница 30: ...30 Center Pivot 7000 8000 8120 Series OVERVIEW ...
Страница 36: ...36 Center Pivot 7000 8000 8120 Series OPERATION Towing Option ...
Страница 40: ...40 Center Pivot 7000 8000 8120 Series OPERATION Towing Option ...
Страница 46: ...46 Center Pivot 7000 8000 8120 Series OPERATION Towing Option ...
Страница 62: ...62 Center Pivot 7000 8000 8120 Series OPERATION Towing Option ...
Страница 102: ...102 Center Pivot 7000 8000 8120 Series MAINTENANCE ...