FP15 & FP15A Waterloo - Installation and Operation Manual
47
B
NON-COMBUSTIBLE
FRAMING (STEEL STUD)
CLEARANCE
D
84" (2.13m)
This section must
remain empty
Non-combustible
material such as
cement board
Non-combustible
finishing material
Refer to the building code or the local code for regulations
concerning the need to install finishing material inside the
chase around the fireplace.
NOTE
THIS FIREPLACE IS BUILT TO MAINTAIN A 1/2" GAP
MINIMUM BETWEEN THE FIREPLACE AND THE
FACEPLACE.
IT IS RECOMMANDED TO HAVE THE NON-
COMBUSTIBLE MATERIAL FLUSH WITH THE
FIREPLACE.
Содержание Waterloo
Страница 2: ...2 FP15 FP15A Waterloo Installation and Operation Manual ...
Страница 11: ...FP15 FP15A Waterloo Installation and Operation Manual 11 2 3 Measurements FP15 ...
Страница 12: ...12 FP15 FP15A Waterloo Installation and Operation Manual ...
Страница 13: ...FP15 FP15A Waterloo Installation and Operation Manual 13 2 4 Measurements FP15A ...
Страница 14: ...14 FP15 FP15A Waterloo Installation and Operation Manual ...
Страница 78: ...78 FP15 FP15A Waterloo Installation and Operation Manual ...
Страница 79: ...FP15 FP15A Waterloo Installation and Operation Manual 79 APPENDIX 9 EXPLODED DIAGRAM AND PARTS LIST FP15 ...
Страница 83: ...FP15 FP15A Waterloo Installation and Operation Manual 83 APPENDIX 10 Exploded Diagram and Parts List FP15A ...
Страница 88: ......