94
FP14 Cartier - Installation and Operation Manual
Refractory
slabs
Replacement
The
intense
heat
of
the
fire
will
normally
cause
hairline
cracks
in
the
refractory
slabs.
These
cracks
can
be
minimized
by
proper
curing
as
described
in
“First
Fires”.
They
will
not
normally
diminish
the
effectiveness
of
the
refractory
slabs.
If
large
cracks
develop,
then
the
refractory
slabs
should
be
replaced.
To
replace
the
refractory
slabs,
follow
these
steps:
1
‐
Using
a
ratchet
and
a
7/16”
(12
mm)
hexagonal
socket,
unscrew
the
two
bolts
(A)
and
remove
the
andiron
(B).
If
necessary,
replace
the
insulating
gasket
(C)
under
the
andiron.
2
‐
Remove
the
front
refractory
slab
(D)
and
floor
refractory
slab
(E).
Содержание FP14 Cartier
Страница 9: ...FP14 Cartier Installation and Operation Manual 9...
Страница 10: ...10 FP14 Cartier Installation and Operation Manual...
Страница 35: ...FP14 Cartier Installation and Operation Manual 35...
Страница 55: ...FP14 Cartier Installation and Operation Manual 55 Direct installation Exterior offset installation...
Страница 91: ...FP14 Cartier Installation and Operation Manual 91 APPENDIX 7 EXPLODED DIAGRAM AND PARTS LIST 61...