84
FP14 Cartier - Installation and Operation Manual
3.
Then,
install
the
flexible
pipe*
(E)
(not
supplied)
to
the
fresh
air
intake
adapter
(B)
using
one
of
the
adjustable
pipe
clamps
(D)
.
Secure
the
other
end
of
the
pipe
to
the
outside
wall
termination
(F)
using
the
second
adjustable
pipe
clamp
(D)
.
The
outside
wall
termination
(F)
must
be
installed
outside
of
the
building.
*Use
the
length
required
for
your
installation
while
respecting
the
maximum
length
of
30
ft
(9
m).
To
avoid
condensation,
it
is
recommended
to
use
an
insulated
pipe
long
enough
and
containing
a
"P
‐
Trap"
loop.
This
configuration
can
be
found
inside
the
chase,
but
must
at
all
times
maintain
clearances
to
combustibles.
4.
When
fresh
air
kit
is
used,
the
air
inlet
block
‐
off
plate
provided
must
be
installed*.
First,
open
the
bottom
louver.
Then
screw
the
block
‐
off
plate
(G)
just
under
the
air
control
arm
with
the
help
of
the
two
screws
provided
(H).
Once
in
place,
the
block
‐
off
plate
will
ensure
that
the
inlet
air
will
enter
through
fresh
air
kit.
*
If
fresh
air
kit
is
not
used,
block
‐
off
plate
should
not
be
used.
Содержание FP14 Cartier
Страница 9: ...FP14 Cartier Installation and Operation Manual 9...
Страница 10: ...10 FP14 Cartier Installation and Operation Manual...
Страница 35: ...FP14 Cartier Installation and Operation Manual 35...
Страница 55: ...FP14 Cartier Installation and Operation Manual 55 Direct installation Exterior offset installation...
Страница 91: ...FP14 Cartier Installation and Operation Manual 91 APPENDIX 7 EXPLODED DIAGRAM AND PARTS LIST 61...