64
FP14 Cartier - Installation and Operation Manual
8.8.2
Universal
Offset
Support
This
support
is
used
to
support
the
chimney
above
an
offset.
When
the
chimney
offset
is
used
to
pass
through
a
wall,
this
support
may
be
used
on
the
wall
to
support
the
chimney.
For
offset
support
installation,
refer
to
the
instructions
provided
with
the
support
by
the
chimney
manufacturer.
Many
manufacturers
will
provide
the
maximum
height
of
chimney
that
can
be
supported
by
the
support.
Make
sure
you
respect
those
parameters.
8.9
Installation
Instructions
for
Masonry
Application
WARNING:
BEFORE
STARTING
THE
INSTALLATION,
THE
MASONRY
CHIMNEY
MUST
BE
INSPECTED
BY
A
QUALIFIED
SWEEP.
The
following
requirements
must
be
respected:
1.
The
chimney
must
be
absolutely
clear
of
any
soot
residue
or
creosote.
Check
for
cracks,
loose
or
missing
bricks
that
could
inhibit
correct
installation
of
the
liner.
2.
The
clearance
to
combustible
must
be
a
minimum
of
1"
between
the
outside
of
the
masonry
and
any
wood
framing
or
loose
insulation.
3.
The
chimney
must
be
built
in
accordance
with
the
current
building
code.
4.
No
other
appliance
can
be
connected
to
the
same
chimney.
Installation:
The
chimney
must
be
relined
with
a
stainless
steel
liner
of
the
same
diameter
as
the
outlet
of
the
fireplace.
For
connection
at
30
°
or
45°
angle,
a
special
connector
(B)
must
be
used
to
connect
the
liner
(C)
to
the
insulated
chimney
(A).
Verify
availability
and
installation
instructions
for
this
connector
with
the
chimney
manufacturer.
Содержание FP14 Cartier
Страница 9: ...FP14 Cartier Installation and Operation Manual 9...
Страница 10: ...10 FP14 Cartier Installation and Operation Manual...
Страница 35: ...FP14 Cartier Installation and Operation Manual 35...
Страница 55: ...FP14 Cartier Installation and Operation Manual 55 Direct installation Exterior offset installation...
Страница 91: ...FP14 Cartier Installation and Operation Manual 91 APPENDIX 7 EXPLODED DIAGRAM AND PARTS LIST 61...