![VALCO MELTON ISOMELT Скачать руководство пользователя страница 62](http://html1.mh-extra.com/html/valco-melton/isomelt/isomelt_user-manual_849620062.webp)
MUS0920201
07/10/2014 57
MELTON, S.L.U. - POLIGONO INDUSTRIAL AGUSTINOS CALLE G-34,31160 ORCOYEN, NAVARRA
TEL: 00 34 948 321580 Fax: 00 34 948 326584 e-mail: [email protected]
6.2. MAINTENANCE RECOMMENDATIONS:
The following table shows how often maintenance operations must be done.
Frequency
Maintenance
As necessary
Change manifold joints and filter cartridge.
Weekly
(40 hours)
Clean the outside surface of the machine. Use a
liquid cleaner recommended by the adhesive
manufacturer.
Inspect all hydraulic, electrical and pneumatic
connections. Change or repair those necessary.
Check the safety valve.
6 months
(2000 hours)
Clean the electric box fan filter.
Clean the tank grill.
Inspect all hydraulic, electrical and pneumatic
connections. Change or repair those necessary.
Check the conditions of the micro switches. They
must be clean and adhesive-free.
Bleed the air filter.
Annually
(4000 hours)
Change the adhesive filter.
Vacuum or remove dust and adhesive remains with a soft cloth, especially from
the manifold and purging valve.
Periodically clean the control panel with a soft cloth. Do not use dissolvent on the
panel as they could corrode the controls.
If using a cleaning agent, make sure it is compatible with the
adhesive being used.
Check with the adhesive manufacturer if you have any doubts.