Supplied By www.heating spares.co Tel. 0161 620 6677
22
BOILER INSTALLATION SEQUENCE
Cold water mains inlet
and hot water outlet
Flush all foreign matter from the mains
supply before connecting to the
boiler.
●
Connect the cold water service
valve (
1
) to the cold inlet water
connection of the appliance with
the washer (
2
) provided and tigh-
ten.
●
Connect cold water service pipe to
the cold water service valve and
tighten.
●
Connect the 15 mm hot water
outlet copper tail (
4
) to the hot
water outlet connection of the
appliance with the washer (
5
) pro-
vided and tighten.
●
Connect hot water outlet pipework
to the copper tail.
Note: The hot water outlet union nut
is packed in with the PRV fittings
pack.
1
2
3
4
5
6
I
0
Euro B/S 045/0GB_Pro
Fig. I.7: Fitting the hot and cold water connections