14
fig. 11
GW 403/0
4. Boiler installation
sequence
4.1 General
The boiler should be mounted on a
flat and vertical area of wall of suf-
ficient area for the boiler plus the
required minimum clearances for
installation and servicing (fig. 11).
These are shown on the installation
template supplied with the boiler and
are:-
5 mm either side of the boiler
150 mm below the boiler
165 mm on top of the boiler
500 mm in front of the boiler *
* This clearance is only required to
enable easier access to the boiler for
servicing and may be provided by an
openable door, etc.
NOTE: If the boiler is to be fitted in a
timber framed building, it should be
fitted in accordance with British Gas
publication reference DM2 'Guide for
gas installations in timber framed hou-
sing.'
4.2 Boiler delivery
ECOmax is delivered in three packs:
a. the carton containing the boiler
b. separately boxed connection group
(Accy No.9313)
c. separately boxed flue accessory,
either:
•
1m horizontal flue accessory
(Accy No. 300931); or
•
vertical flue accessory
(Accy No. 300945)