background image

VAG Operating and Maintenance Instructions • 6

l

 

Blind thread hole

¡

 

Through hole

Picture 4: Blind thread hole and through hole

DN 50...65

DN 80...200

DN 250...300

DN 400

DN 500...600

DN 700

DN 800

DN 900

DN 1000

Flanges

Pipeline end installation

Connecting dimensions acc. to DIN EN 

1092-1 Typ 11

Blind thread hole 

l

Through hole 

¡

 

DN

bolt circle 

&

flange 

outside 

&

thread 

height T

Threaded pin DIN 939

Hexagon nut

DIN 939

Hexagon head 

screw

DIN EN 24014

Hexagon nut

DIN 934

qty

dimension

qty

size

qty

dimension

qty

size

50

125

165

10

4

M16 x 35

4

M16 

-

-

-

-

65

145

185

12

4

M16 x 35

4

M16 

-

-

-

-

80

160

200

12

4

M16 x 40

4

M16 

4

M16 x 90

4

M16 

100

180

220

14

4

M16 x 40

4

M16 

4

M16 x 90

4

M16 

125

210

250

15

4

M16 x 45

4

M16 

4

M16 x 100

4

M16 

150

240

285

15

4

M20 x 45

4

M20

4

M20 x 100

4

M20

200

295

340

15

4

M20 x 45

4

M20

4

M20 x 110

4

M20

250

350

395

17

8

M20 x 50

8

M20

4

M20 x 120

4

M20

300

400

445

22

8

M20 x 55

8

M20

4

M20 x 130

4

M20

350

460

505

22

10

M20 x 55

8

M20

6

M20 x 130

6

M20

400

515

565

26

10

M24 x 60

10

M24

6

M24 x 140

6

M24

500

620

670

30

14

M24 x 65

14

M24

6

M24 x 160

6

M24

600

725

780

32

14

M27 x 70

14

M27

6

M27 x 180

6

M 27

700

840

895

27

16

M27x80

16

M 27

8

M 27 x 260

8

M 27

800

950

1015

30

16

M30x90

16

M 30

8

M 30 x 280

8

M 30

900

1050

1115

30

18

M30x90

18

M 30

10

M 30 x 300

10

M 30

1000

1160

1230

33

18

M33x100

18

M 33

10

M 33 x 320

10

M 33

1200

1380

1455

36

24

M36x110

24

M36

8

M36x380

8

M 36

1400

1590

1675

39

26

M39x120

26

M39

10

M39x420

10

M 39

Table  2: Connection parts for flange connection, pipeline end installation 

Connection parts for flange connection, pipeline end installation

Lengths of screws are for pre-welded flanges acc. to DIN EN 1092-1, PN 10 type 11, washers acc. to DIN 125 (ISO 7090). DN 50...600: Flat gaskets acc. to DIN EN 1514-

1 / PN 10 / shape IBC, thickness 3 mm; DN 700...1400: Flat gasket according to DIN EN 1514-1 / PN 6 / shape IBC, thickness 8 mm, (flange sealing face PN 6)

T

T

DN 700...1400

DN 50...600

DN 1200

DN 1400

Содержание ZETA

Страница 1: ...KAT B2 2410 Edition 8 30 11 2017 VAG ZETA Knife Gate Valve Version with AUMA electrical multiturn actuator EA Operating and Maintenance Instructions...

Страница 2: ...on site 4 4 2 Installation location 4 4 3 Installation position 4 4 4 Assembly instructions and fittings 5 5 Putting the valve into operation 7 5 1 Visual check of the valve 7 5 2 Putting the electric...

Страница 3: ...t information adjustment torques etc The screws of the switch mechanism cover are fac tory sealed with sealing wax Breaking this seal by unauthorised opening will result in the loss of warranty 1 Gene...

Страница 4: ...nstructions must be observed The control orifice must be positioned in flow direction downstream of the knife The control orifice must be positioned in pressure direction direction of action of the di...

Страница 5: ...ween the valve and the flange is too wide this should to be compensated by thicker gaskets We recommend steel reinforced rubber gaskets accor ding to DIN EN 1514 1 shape IBC for sealing If the flan ge...

Страница 6: ...300 400 445 22 8 M20 x 55 8 M20 4 M20 x 130 4 M20 350 460 505 22 10 M20 x 55 8 M20 6 M20 x 130 6 M20 400 515 565 26 10 M24 x 60 10 M24 6 M24 x 140 6 M24 500 620 670 30 14 M24 x 65 14 M24 6 M24 x 160 6...

Страница 7: ...tch will not work 5 2 4 The electric actuator can only operate the valve over its ent ire length of stroke when the direction of rotation and the polari sation are correct 5 2 5 Operate the valve over...

Страница 8: ...roke In case of difficult movement clean and lubricate the stem and knife 6 3 2 Repairing a leak at the outlet of the knife After longer shut down periods the seal may be slightly leaky If leaks persi...

Страница 9: ...ng Unit 3 when necessary Under extreme operating conditions the parts mentioned above may have to be replaced more frequently Pos Description KIT 1 KIT 2 KIT 3 1 Body 2 Thrust piece 3 Knife 4 Rising s...

Страница 10: ...t solve the problem dismantle the valve dismantle the knife clean it lubricate it replace dama ged parts See also Section 6 1 High operating forces Lateral seal is too tight Evenly unfasten the screws...

Страница 11: ...l Reuther Str 1 68305 Mannheim Germany Phone 49 621 749 0 Fax 49 621 749 2153 info vag group com http www vag group com Service Our service hotline can be reached 24 7 world wide In case of emergency...

Страница 12: ...Edition 7 12 08 2013 www vag group com info vag group com...

Отзывы: