12
13
Installation
Finish the wall by tiling up to the
mortar guard, keep the final finished
wall surface between the min and max
marks.
Unscrew the 2 mortar guard screws
and remove from the wall.
Screw spigot into the outlet on the
valve. Tighten using a 6mm hex key.
Your valve is now ready to be
commissioned.
Please refer to page 15 to ensure
your valve is calibrated.
Cold inlet
Hot inlet
Outlet 1
Handset
outlet
Connect cold supply to the lower left
inlet of the valve and hot supply to the
upper left inlet.
Connect outlet 1 to the desired channel
e.g. to the shower head.
Note:
outlet 2 will be connected to the
handset.
Mortar
guard
6mm
hex key
Mortar guard
screws
Spigot
Installation - trim
Temperature handle (left)
Ensure the temperature handle is correctly
located with the handle stop at 12 o’clock
(see right). Carefully slide the handle on
the splines, secure with the grub screw and
insert rubber cap in hole.
Flow handle (right)
With the handle pointing up in the off
position carefully slide onto the splines,
secure with the grub screw and insert
rubber cap in hole.
Handle stop at
12 o’clock
Inside of temperature handle
Screw the two shrouds onto the valve.
The handset holder has slight adjustment. First guide the handset holder
partially onto the spigot and then slide the cover plate over the shrouds.
Push the cover plate up to the wall and tighten the two grubscrews on the
underside of handset holder to secure it to the spigot. Apply a thin bead of silicone
around the outside to seal against the tiled surface.
Flow
Handle
Shrouds
Cover
plate
Temperature
Handle
Handset holder
Spigot