background image

11

10

Installation

Select the position for the shower valve and offer the shower valve to the wall, 

make sure the valve is level and mark the 6 fixing points with a suitable pencil, see 

above for dimensions.  Remove the shower valve from the wall, drill the holes to a 

suitable depth for the wall plugs and secure with suitable screws.

Mortar 

guard

Fixing 

screws

77mm

Fixing points

90mm

142mm

MAX

MIN

Wall

Mortar guard  (wall shown in minimum position)

Installation

Flush pipe work thoroughly before fitting the valve.
       

Warning!

  Please check for any hidden cables and pipes before drilling holes in 

the wall. 

The valve must be set into the wall between (75mm minimum – 100mm maximum)  

If you are fitting the valve to a partition wall or a wall of particularly soft substrate 

you will need specialist fixings. 

Please contact VADO or retailer for WG-STUDFAST-C-S/S fixing.

Mortar guard

 

During installation please leave the mortar guard secured to the valve to avoid 

damage to the product and protect the internals during tiling etc.

Valve

Mortar 

guard

Содержание ALTITUDE TAB-148/2WO-ALT-CP

Страница 1: ...ITUDE Keep for future reference Installation Guide where inspiration flows Vado Wedmore Road Cheddar Somerset England BS27 3EB tel 01934 744466 fax 01934 744345 aftersales vado com www vado com This instruction booklet covers model TAB 148 2WO ALT CP Version 1 1 2 20 ...

Страница 2: ... and Scottish Byelaws 2004 For further information contact the Water Regulations department of your local water supplier see the WRAS website www wras co uk for details or the Water Regulations Advisory Scheme by email info wras co uk or telephone 01495848454 Before making any inlet pipe connections all supply pipes MUST be thoroughly flushed to remove debris Failure to do so could result in damag...

Страница 3: ...4 5 Contents of Packaging Shower hose with 2 washers Handset Hex key Rubber caps x 2 Adaptors to x 3 Dimensions 95mm 80mm 40mm 80mm 285mm 125 5mm 75 100mm ...

Страница 4: ...6 7 Installation Quick guide 1 2 77mm 142mm 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 90mm 4 6mm Installation Quick guide 5 6 1 2 3 ...

Страница 5: ...8 9 Installation Quick guide 9 10 Installation Quick guide 7 8 x 1 x 2 x 2 ...

Страница 6: ...wall shown in minimum position Installation Flush pipe work thoroughly before fitting the valve Warning Please check for any hidden cables and pipes before drilling holes in the wall The valve must be set into the wall between 75mm minimum 100mm maximum If you are fitting the valve to a partition wall or a wall of particularly soft substrate you will need specialist fixings Please contact VADO or ...

Страница 7: ...erature handle left Ensure the temperature handle is correctly located with the handle stop at 12 o clock see right Carefully slide the handle on the splines secure with the grub screw and insert rubber cap in hole Flow handle right With the handle pointing up in the off position carefully slide onto the splines secure with the grub screw and insert rubber cap in hole Handle stop at 12 o clock Ins...

Страница 8: ... the calibration of the valve to suit individual requirements of the installation 1 Check the temperature of the water being delivered to the outlet with a thermometer when the handle is located at 12 o clock NOTE temperature readings should be taken at normal flow rate after allowing for the system to stabilise 2 If the temperature is not 38 proceed to reset the calibration as follows Do not remo...

Отзывы: