Figure 6.10
Figure 6.11
6. Whereby the wing sections turn backward, see
and
.
Figure 6.12
7. The wing sections are locked automatically. The
packer is now ready for transportation.
6.2.2
Switching to the working position
Figure 6.13
1. Drive forward and stop.
Figure 6.14
2. Lower/push the front tools all the way out using the
hydraulic system.
Figure 6.15
3. Make sure that pointer A does not activate C on the
depth stopper, see
“8.4 Setting the depth stopper“
(pointer A can be moved to area B to prevent depth
stopper C from being activated when the front tool
has been pushed all the way out).
C
B
A
22
903815-en-gb; 23.09.2021
Содержание CR 925
Страница 1: ...903815 en gb 23 09 2021 02 Original instructions Instructions Carrier CR 925 1225 Serial No CR00016466...
Страница 2: ...V derstad Holding AB V derstad Sweden 2021 903815 en gb 23 09 2021...
Страница 51: ...Hydraulics system diagram 10 Hydraulics system diagram Figure 10 1 CR925 903815 en gb 23 09 2021 47...
Страница 53: ...Hydraulics system diagram Figure 10 2 CR1225 903815 en gb 23 09 2021 49...
Страница 57: ...53 903815 en gb 23 09 2021...
Страница 58: ...Where farming starts V derstad AB SE 590 21 V DERSTAD Sweden Phone 46 142 820 00 www vaderstad com...