CRX 425-625
01.05.2015 1
27
2.10 Setting implement parallel alignment
Figure 2.17
The parallel alignment of the implement is adjusted using either the length of the top rod or the
height position of the hydraulic arms, depending on which hitching point has been selected in the
implement tower, see
“2.4 Selecting hitching points” on page 19
.
Adjustment is done out in the field on a flat surface. Adjust the top rods or hydraulic arms so that
the surface (A) of the centre beam is parallel to the surface on which the implement is standing.
A
Содержание Carrier CRX 425-625
Страница 2: ...2 01 05 2015 1 Väderstad Holding AB Väderstad Sweden 2015 ...
Страница 4: ...4 01 05 2015 1 ...
Страница 9: ...CRX 425 625 01 05 2015 1 9 1 3 Location of warning decals on the implement Figure 1 3 C C D B A ...
Страница 13: ...CRX 425 625 01 05 2015 1 13 Lifting points and lashing points Figure 1 7 ...
Страница 14: ...Safety rules 14 01 05 2015 1 ...
Страница 47: ......