page 18 of 92
between diaphragm and head cover. See section „Re-
placing diaphragms and valves“, pg. 60). Inspect the
pump chambers regularly and clean if necessary.
•
Consider interactions and chemical reactions of
the pumped media.
Ensure that the materials of the
pump’s wetted parts are compatible with the pumped
substances, see section „Technical data“, pg. 25.
When changing the substances pumped, we recom-
mend purging the pump with air or inert gas prior to
changing the pumped media. Purging the pump will
pump out residues and it will reduce the possibility of
reactions of the pumped substances with each other
and with the pump’s materials.
Safety during operation
➨
Adopt suitable measures to prevent the release of dan-
gerous, toxic, explosive, corrosive, noxious or pollut-
ing fluids, vapors and gases. To prevent any emission
of such substances from the pump outlet, install an
appropriate collecting and disposal system and take
protective action for pump and environment.
➨
You must take suitable precautions to prevent any for-
mation of explosive mixtures in the pump chamber or
at the outlet of the pump. In case, e.g., of a diaphragm
failure, mechanically generated sparks, hot surfaces
or static electricity may ignite these mixtures. Use inert
gas for gas ballast or venting, if necessary.
➨
Drain appropriately or otherwise remove any poten-
tially explosive mixtures at the outlet of the pump, or
dilute them to non-explosive concentrations.
➨
Never operate this pump if it has a damaged cord or
plug.
+
If the pump is not working properly, has been dropped
or has fallen into water, contact your pump service pro-
Содержание MZ 1C
Страница 30: ...page 30 of 92 MD 1C MD 1C C US only pump with dual voltage motor 7 10 11 6 9 8 5 4 3 2 3 2 3 2 ...
Страница 31: ...page 31 of 92 MZ 1C 3 2 7 10 11 6 9 8 ...
Страница 32: ...page 32 of 92 MD 1C AK EK 10 3 6 1 8 2 9 7 15 16 17 13 11 8 14 19 18 ...
Страница 33: ...page 33 of 92 MD 1C VARIO SP 7 10 6 12 11 8 Ensure sufficient venting of the pump ...
Страница 63: ...page 63 of 92 Checking diaphragms and valves 1 2 3 MD 1C AK EK 10 mm 2 5 mm MD 1C AK EK MD 1C AK EK 5 1x ...
Страница 64: ...page 64 of 92 4 3A 5 MD 1C size 2 2x 1 17 mm 14 mm max 1 4 ...
Страница 66: ...page 66 of 92 6 7 8 4 6x Clean ...
Страница 67: ...page 67 of 92 9 Replacing the diaphragm 10 11 20696828 20696838 ...
Страница 68: ...page 68 of 92 12 1 2 3 13 14 Pay attention to number of washers ...
Страница 69: ...page 69 of 92 15 16 17 Pay attention to number of washers ...
Страница 70: ...page 70 of 92 18 1 2 19 20 4x Replacing the valves and assembling the pump heads ...
Страница 71: ...page 71 of 92 21 22 23 ...
Страница 73: ...page 73 of 92 27 28 1 2 28A size 2 2x 17 mm 10 mm MD 1C AK EK 5 1x MD 1C ...
Страница 74: ...page 74 of 92 29 30 31 Assembling the connecting hose MD 1C AK EK 2x ...
Страница 77: ...page 77 of 92 5 6 4 20638821 20638821 ...
Страница 89: ...page 89 of 92 ...
Страница 90: ...page 90 of 92 ...
Страница 91: ...page 91 of 92 ...