Commissioning (operation)
5 Commissioning (operation)
5.1 Switch on
Switch pump on
(b)
1
(a)
2
1.
Switch rocker switch
(a)
on – switch position
I
.
2.
Press ON/OFF button
(b)
on the controller.
5
The start screen is displayed.
5
After approx. 30 seconds, the process screen appears
with the operating elements in the controller display.
5.2 Operation
Apart from the chapters Switch on and Switch off, this manual de
‑
scribes the mechanical structure of the diaphragm pumps.
Operation of the vacuum controller and its functions are described
in the separate
VACUU·SELECT
manual.