Service
vacon • 55
Local contacts: https://www.danfoss.com/en/contact-us/contacts-list/
5.
S
ERVICE
5.1
Warranty
Only manufacturing defects are covered by the warranty. The manufacturer assumes no
responsibility for damages caused during or resulting from transport, receipt of the delivery,
installation, commissioning or use.
The manufacturer shall in no event and under no circumstances be held responsible for damages
and failures resulting from misuse, wrong installation, unacceptable ambient temperature, dust,
corrosive substances or operation outside the rated specifications.
Neither can the manufacturer be held responsible for consequential damages.
The Manufacturer's warranty period is 18 months from the delivery or 12 months from the
commissioning whichever expires first (Danfoss general terms and conditions of sale).
The local distributor may grant a warranty time different from the above. This warranty time shall
be specified in the distributor's sales and warranty terms. Danfoss assumes no responsibility for
any other warranties than that granted by Danfoss itself.
In all matters concerning the warranty, please contact your distributor first.
5.2
Maintenance
All technical devices, drives as well, need a certain amount of care-taking and failure preventive
maintenance. To maintain trouble-free operation of the VACON
®
drives, environmental conditions,
as well as load, line power, process control, etc. have to be within specifications, determined by
manufacturer.
If all conditions are in accordance with the manufacturer's specifications, there are no other
concerns, but to provide a cooling capacity high enough for the power- and control circuits. This
requirement can be met by making sure, that the cooling system works properly. Operation of
cooling fans and cleanness of the heat sink should be verified regularly.
Regular maintenance is recommended to ensure trouble free operation and long lifetime of the
VACON
®
drives. At least the following things should be included in the regular maintenance.
It is also recommended to record all actions and counter values with dates and time for follow up of
maintenance.
Table 15. Maintenance schedule
Interval
Maintenance
12 months (if unit is stored)
Reform the capacitors
6-24 months (depending on
environment)
Check the tightening torques of the input and output terminals
and I/O terminals.
Clean the cooling tunnel.
Check operation of the cooling fan, check for corrosion on termi-
nals, busbars and other surfaces.
5-7 years
Change the cooling fans:
• Cabinet fans
• Drive fans
• LCL filter fans
5-10 years
Change the DC-link capacitors if DC voltage ripple is high.