• Identify power source.
This could be a nearby plug outlet, a junction within a drop ceiling or
PoE ethernet port. Unit does not require a dedicated circuit.
• Make a plan for getting power to installation site.
Buy supplies needed to make the
connection.
• Run electrical to install location.
Perform the following steps before the wall façade is
installed.
•
For AC power: Turn off electrical power to the installation circuit by tripping the
breaker and locking it out.
• If you are installing for a retrofit and need access within the wall cavity before running
power, skip to page 8 and then return here after completion.
• For AC power: Within the wall cavity, run single-phase AC electrical wiring from the
nearest junction box or electrical panel to the planned installation point for the Vaask
fixture. If using conduit, make sure it’s flexible conduit.
• For Power over Ethernet: Run a PoE cable from your Ethernet power sourcing equipment
to the installation wall cavity.
NOTE: If you are running power for a Vaask unit that will not be installed until
after the building is occupied, stop here. When the unit arrives, proceed to page 8.