Utilicor MC450 Скачать руководство пользователя страница 32

Warranty

MC450 Coring Unit. Operator’s Manual

© 2020 Utilicor Technologies Inc.

30

WARRANTY.

 the Vendor warrants for the benefit of the Purchaser, and not for 

any other person, that each new the Vendor product sold by it, or by any of its 
authorized distributors or dealers, will be free from defects in workmanship and 
material under normal use and service for a period of twelve (12) months from 
the date of delivery to the original Purchaser, provided that this warranty shall 
not apply to any the Vendor product which has been subjected to misuse, 
negligence or accident or which shall have been altered or repaired by anyone 
other than an authorized the Vendor representative in any way which, in the 
Vendor’s judgment, might affect its stability or reliability, nor to normal wear and 
tear, operating costs and adjustments, including but not limited to adjusting 
pressure settings, limit switches, timers, relays, fuses, loss of hydraulic oil, cable 
replacement or filter replacement.  Vendor’s obligation under this warranty is 
limited to repairing or replacing, as hereinafter provided, at its option, any part 
or parts of said product found, to the Vendor’s satisfaction, to be defective upon 
examination and provided that such part or parts shall be returned to the 
Vendor’s facility at no cost to the Vendor.  Labor charges to install any replace-
ment part will be allowed in accordance with the Vendor's schedule of applicable 
labor rates.  the Vendor shall not be liable for any freight, travel costs or other 
similar costs in connection with this warranty and the Purchaser shall be solely 
responsible for all such costs.  All products that are not manufactured by or on 
behalf of the Vendor, including but not limited to engines and motor vehicles, 
power control systems, electric motors, hydraulic cylinders and pumps shall be 
subject to only the warranty of the manufacturer or vendor of such product.  
THIS WARRANTY IS MADE EXPRESSLY IN LIEU OF ANY OTHER WARRAN-
TY, EXPRESS OR IMPLIED, INCLUDING ANY IMPLIED WARRANTY OF 
MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE.  

MAXIMUM LIABILITY.

  Notwithstanding anything to the contrary set out in 

this Purchase and License Agreement, the maximum aggregate liability of the 
Vendor in relation to any matter connected with the Purchase, License or 
Operation of the Equipment or the license of the Vendor Technology, shall be 
limited to the amount paid to the Vendor for the goods for which liability is 
claimed.  Further, the Vendor shall not have any liability to the Purchaser or to 
any other person in relation to the Purchase, License to Use or Operation of 
the Equipment or the license to use the Vendor Technology for any special, 
indirect or consequential damages, including but not limited to loss of profits, 
loss of business opportunities, downtime, delay or loss of business investment.

PLEASE COMPLETE AND SUBMIT WARRANTY CARD 

TO:   [email protected]

ATTENTION

Содержание MC450

Страница 1: ...MC450 CORING ATTACHMENT Operator s Manual 2020 Utilicor Technologies Inc V2 2 062020 ...

Страница 2: ... Coring Step 1 Attachment Drive Controls 9 Step 2 Lock Down Latch 10 Step 3 Coolant Water 11 Step 4 Begin to Cut 12 Notes 14 Parts and System Unit Components 15 Core Drum Assembly 17 Pillow Block Assembly 18 DryLin Rails and Cars 19 Schematics Hydraulic Schematic 20 Electrical Schematic 21 Pre Trip Check List 22 Utilicor Process Central Pilot Bit 23 Winterizing 24 Tips for Successful Coring Operat...

Страница 3: ...Operator s Manual 2020 Utilicor Technologies Inc 1 Read operator s manual Know how to use all controls Your safety is at stake To help avoid injury Familiarize yourself with all warning labels ALWAYS WEAR APPROPRIATE PERSONAL PROTECTION EQUIPMENT PPE WHILE OPERATING THIS EQUIPMENT FAILURE TO DO SO MAY RESULT IN PERSONAL INJURY OR DEATH UTIWL 006 UTIWL 009 DO NOT OPERATE THIS EQUIPMENT WITHOUT READ...

Страница 4: ...5 lb 413 kg Water Tank Full 30 gal 227 l Weight includes Core Package 8 in core drum 680 lb 300 kg Water Tank Empty 922 lb 413 kg Water Tank Full 30 gal 227 l Weight includes Core Package 12 in core drum 700 lb 300 kg Water Tank Empty 942 lb 413 kg Water Tank Full 30 gal 227 l Weight includes Core Package 18 in core drum 740 lb 300 kg Water Tank Empty 982 lb 413 kg Water Tank Full 30 gal 227 l Cap...

Страница 5: ...late to remove any debris that might interfere with the attachment installation Start the machine engine lower the loader arm and tilt the mounting plate forwards NOTICE Make sure that both of the attachment lock pins are in the Unlocked Position Slowly drive towards the attachment and align the top edge of the male mounting plate and the upper lip of the female attachment mounting plate NOTICE Ma...

Страница 6: ... machine 7 Start the engine and raise the attachment off the ground Visually inspect the bottom edge of the attachment s mounting plate to make sure that both of the attachment lock pins are securely holding the attachment in position If the pins are not engaged shift the unit Left or Right until the pins drop into the locked position Lower MC450 to the ground and turn off the mini skid steer 8 En...

Страница 7: ...engine off and operate all controls to relieve pressure Lower block or support any raised component with a hoist Cover connection with heavy cloth and loosen connector nut slightly to relieve residual pressure Catch all fluid in a container Before using system check that all connections are tight and all lines are undamaged Use a piece of cardboard or wood rather than hands to search for leaks Wea...

Страница 8: ...lt connection Auxiliary 12 volt outlet Plug in 12 volt line to Auxiliary Outlet If Equipped or wire 12 volt line directly to the battery 15 Amp in line fuse is recommended for this application Consult the operators manual from the mini skid steer for location of this receptacle Overview ...

Страница 9: ...450 until the rear pads make contact with the paved surface continue to lower the MC450 until the front of the tracks on the mini skid steer unit are slightly elivated transfering some of the weight of the mini skid steer to the coring unit Using the Tilt Control Lever lower the front of the unit so all four feet are in contact with the paved surface MC450 Coring Unit Operator s Manual 2020 Utilic...

Страница 10: ...ate before engaging the hydraulic controls 10 To verify that the oil is flowing in the right direction move the Drum Speed Lever up and to the right If the Core drum begins to turn the oil is flowing in the right direction If the drum does not turn reverse the flow from the powering unit 11 Increase the Core Drum Speed to as per chart below 8 inch Diameter Core Drum 250 to 270 RPM 10 inch Diameter...

Страница 11: ...t Auxilary Flow Control 2 Pull the Control Lever back Forward Flow to engage the hydraulics Note The MC450 is equipped with a one way valve on the tank line to prevent the oil from flowing in the wrong direction If the unit does not operate with the Auxilary flow in the Forward flow position engage the auxilary flow in the Reverse direction Reverse Flow Attachment Drive Control Before beginning an...

Страница 12: ...ove the U bolt from the receiving hook and lower the handle The Lock Down Latch is installed to prevent the coring drum assembly from creeping down during transport The Lock Down Latch should always be engaged when transporting moving or storing the MC450 Lock Down Engaged Lock Lock Released DO NOT OPERATE THE STEERING WHEEL WHILE THE LOCK DOWN LATCH IS ENGAGED ...

Страница 13: ...ng the coring operation Adjust flow so that the slurry created is dense but flowing Core Cutting MC450 Coring Unit Operator s Manual 2020 Utilicor Technologies Inc 11 ATTENTION The coring process requires water to cool the core drum and the pilot bit Make sure the water tank is full before you begin the coring operation The process uses approximately 1 gallon of water per inch depth cut Petcock OO...

Страница 14: ...Auxiliary Water Hose to cool the drum until it has fully seated in the pavement 4 Continue coring keeping the Core Rotational pressure between 500 and 750 PSI Too much down pressure will cause the core drum to lift the MC450 This may result in damage to the equipment The coring process varies depending on the substrates you are cutting through For best results slow and steady feed works best If th...

Страница 15: ...r clockwise 8 Shut off Coring Drum when the drum clears the substrate 9 Close Water Petcock and turn off Coolant Water Pump 10 Insert a screw driver or small pry bar in the Kerf and gently apply force If the core moves you have successfully cut the core and you can move the MC450 to the next cut location NOTE If the core does not move continue with the coring process 11 Engage Lock Down Latch befo...

Страница 16: ...Notes MC450 Coring Unit Operator s Manual 2020 Utilicor Technologies Inc 14 ...

Страница 17: ...ilicor Technologies Inc 15 MC BEACON MC MAL20 30 10 MC PC6C TR LPGUN TR SWHEEL MC 125HYDM PB COMP MC SPSEN MC MAGPU MC DRPIN MC 450DOOR MC 450RUB TR FLOWSML TR BVGLY TR FILTER SML TR BVGLY TR IGUSCAR MC IGUSRAIL MC WATCAP MC 450HS TR HYDHC12 MC BRFC TR IGUSCAR ...

Страница 18: ...MC DRPIN TR SWHEEL MC ESTOP MC WATSW MC RPMG MC BRFC TR 2000F TR IGUSCAR TR CLAMP MC 450ES12 MC PD5090 MC BEACON TR 3000F MC NOPOPASM SV3 12 O 300AA TR HYDHC12 MC LVSST MC 450HS MC MAL20 30 10 MC PC6C MC 125HYDM MC WATCAP TR LPGUN BP COMP MC MAGPU MC SPSEN MC 450DOOR MC 450RUB MC 450WFG ...

Страница 19: ...Parts MC450 Coring Unit Operator s Manual 2020 Utilicor Technlogies Inc 17 CORE DRUM ASSEMBLY CP AFLNG CD 8 CD 10 CD 12 CD 18 CP PDC GR 5 HHCS 3 8 X 1 1 2 CP SHAFT18 CP SHAFT16 CP SHAFT14 ...

Страница 20: ... PB BR Tapered Bearing Race 2 4 PB MS Pillow Block Shim 1 5 PB PB Pillow Block Casing 1 6 PB WS Pillow block Water Seal 2 7 PB EX Pillow block Key stock 1 8 PB SW Pillow Block Water Swivel 1 6 Part No Description Qty PILLOW BLOCK ASSEMBLY THE PILLOW BLOCK MOUNTED ON THE MTC 100 IS FULLY GREASED ONLY ADD GREASE TO THE PILLOW BLOCK DURING THE REBUILD PROCESS ...

Страница 21: ... Manual 2020 Utilicor Technlogies Inc 19 1 DLHD DryLin Heavy Duty Car 4 2 IRDR IgusRailMTC 2 3 HHCS M10x40 16 4 SHCS M8 X 40 32 Part No Description Qty DRYLIN RAILS AND CARS 1 2 3 4 Cars are self adjusting and self lubricating ATTENTION ...

Страница 22: ...RY AND CONFIDENTIAL NOTICE UTILICOR TECHNOLOGIES CLAIMS PROPRIETARY RIGHTS ON THE INFORMATION DISCLOSED ON THIS DRAWING IT IS ISSUED IN CONFIDENCE AND MAY NOT BE REPRODUCED OR USED TO MANUFACTURE ANYTHING SHOWN HEREON WITHOUT DIRECT WRITTEN PERMISSION FROM Utilicor TECHNOLOGIES TO THE USER DRAWN BY CHECKED BY SCALE DATE SIZE TITLE THIRD ANGLE PROJECTION PART NUMBER LEVEL REV MC450 Electrical Syste...

Страница 23: ...NLESS OTHERWISE SPECIFIED APPLY STS STANDARDS DIMENSIONS ARE INCHES DO NOT SCALE DRAWING PROPRIETARY AND CONFIDENTIAL NOTICE UTILICOR TECHNOLOGIES CLAIMS PROPRIETARY RIGHTS ON THE INFORMATION DISCLOSED ON THIS DRAWING IT IS ISSUED IN CONFIDENCE AND MAY NOT BE REPRODUCED OR USED TO MANUFACTURE ANYTHING SHOWN HEREON WITHOUT DIRECT WRITTEN PERMISSION FROM Utilicor TECHNOLOGIES TO THE USER DRAWN BY CH...

Страница 24: ...re that MC450 is raised high enough to clear the trailer in loading forwards or to clear the ground if loading backwards otherwise serious damage to the unit may result However unit should be kept as low as possible at all times 8 Do not use the D Hooks on the MC450 to secure the mini skid steer to the trailer Alway lash mini skid steer to trailer as per opertaors manual 8 Are your Driver s Licens...

Страница 25: ... complexity to the coring process 3 Strength and Stability The central pilot hole when filled with Utilibond increases the bonding surface of a typical 12 deep 18 diameter core by almost 100 square inches a 13 increase in bonding surface area and adds strength to the reinstatement process In addition to increased surface bond strength this central column of Utilibond acts as a continuous stabilizi...

Страница 26: ...tom rear of Unit 2 Insert Hose A in a container of Glycol 3 Turn Red valve handles to Winterizing Mode Figure 24 2 4 Open the Pillow Block Petcock Valve 5 Turn on Water Pump and run until water hose fills with Glycol 6 Close the Pillow Block Petcock Valve 7 Spray auxiliary Water Nozzle until it too is filled with Glycol 8 Turn off water pump 9 Turn Red valve handles to Operational Mode Figure 24 1...

Страница 27: ... lifts off the ground 5 Remember to raise the coring drum completely out of the cut area periodically during the coring operation This will help to remove any build up of suspended solids and cutting debris that can cause the core to become lodged in the drum Keep the cut space surrounding the core or kerf clean and free of debris 6 You will know you are through the concrete asphalt pavement when ...

Страница 28: ...r sometime In warmer climates it is good practice to feel certain hydraulic components or tanks for excessive heat If there is a problem of oil overheating it may be detected by checking hydraulic pumps for heat build up during early hours of operation Some components will build up heat quicker if operating incorrectly Control valves and relief valves may also cause heat build up if they are bypas...

Страница 29: ...r easy and safe extraction of core drums which have become stuck in the pavement during the coring process Bolts onto A Flange style coring drums Removable handle for easy storage Part AC EXTRACT Simultaneously cuts center hole when cutting core 2 3 8 polycrystalline diamond AW ROD threads Superior penetration rates Part CP PDC Specifically designed for keyhole core extraction and core reinstateme...

Страница 30: ...ing Unit Operator s Manual 2020 Utilicor Technologies Inc 28 Replacement tapered bearing race Sold as each two required Part PB BR Self priming Run dry capable Flow rate 6 LPM Includes all fittings and wiring harness Part TR FLOW450 Replacement steering wheel for orbital control Incudes Hub and Spinner Part TR 12SW Complete Pillow Block Water Swivel Assembly Pillow Block Spindle Shaft Pillow Block...

Страница 31: ...18 AC 18RP 24 AC 24RP Allows for roadway to be opened for longer durations Durable 1 4 thick checker plated top Precise expansion gasket of polyurethane expands to secure road plate in place Five sided penta style bolt resists tampering Powder Coated safety yellow for visibility Part s 12 AC 12RPS 18 AC 18RPS 24 AC 24RPS Tools set required to complete core reinstatements Includes Two flat trowels ...

Страница 32: ...ill be allowed in accordance with theVendor s schedule of applicable labor rates theVendor shall not be liable for any freight travel costs or other similar costs in connection with this warranty and the Purchaser shall be solely responsible for all such costs All products that are not manufactured by or on behalf of theVendor including but not limited to engines and motor vehicles power control s...

Отзывы: