Usl LSS-100P Скачать руководство пользователя страница 15

 

LSS−100P Installation & Operation Manual 

v160817 

 

15 

 

 

 

6.

 

The luminance and color (x, y) should agree with an accurate color meter. Spectrometer-based 
color meters are the most accurate for xenon-based projectors (see 

http://ftp.uslinc.com/?dir=ftp/Products/LSS-100P/Documents/Technical/ColorMeasurement

 for 

more information on the LSS-100P color measurement). Note that luminance varies with 
measurement position due to the incident angle of the projector light with the screen and 
screen gain. 

7.

 

Turn on a pink noise source on one of the auditorium speakers (or play the test DCP which 
contains pink noise on each speaker in sequence). The SPL indicated by the LSS-100P should be 
close to that measured with an SPL meter. Again, due to system tolerances and variations in 
sound level throughout the auditorium, the numbers will not match precisely. 

 

NTP, IR, and Luminance Check 

 

1.

 

Go back to the NTP configuration page (shown in figure 8) and ensure that the LSS-100P has 
received an NTP update. 

2.

 

If desired, the LSS-100P luminance measurement can be scaled to agree with a reference meter. 
The LSS-100P is factory calibrated, but, because it is not in the same location as a reference 
meter in the auditorium, it will probably read slightly different from the reference meter due to 
screen gain, elevation of the projector above the screen center, etc. Project the test pattern 
(ideally from the LST-100) and measure the luminance with the reference meter. While the test 
pattern is still present, key the measured luminance value into the appropriate box (cd/m

2

 or fL) 

in the Luminance Scaling section of the Auditorium Data page (see figure 6). Click the “Save 
Settings” button to scale the LSS-100P luminance measurement to match the reference meter. 
You can click the “Reset Luminance Scaling” button to return the LSS-100P to factory calibration. 

3.

 

IR Calibrate also appears on the Auditorium Data page (board revision F and higher). Press the 
“Set IR Reference” button when typical IR illumination of the screen is present. When the LST-
100 test content plays, a USL UPC-28C emitter transmits the hearing impaired and closed 
caption carriers, but not the visually impaired carrier. If you click the “Set IR Reference” button 
when the LST-100 content is playing, the LSS-100P will set this level to 100%. The LSS-100P will 
read about 75% if only one IR carrier is present. It will read about 117% if all 3 carriers are 
present. 

Writing Command Scripts 

 
The LSS-100P script definition page includes default scripts. These can be copy and pasted into the script 
definition window. This section covers running the test DCP and configuring limits on the scripts. 

 

1.

 

Download the LSS-100P test content from 

http://ftp.uslinc.com/?dir=ftp/Products/LSS-

100P/Software/TestContent

 . The README.txt file describes the test content and provides 

sample scripts. 

2.

 

There are three ways that a Command Script may be triggered. The recommended method is to 
use the red/green script trigger clips located that is included in the content downloaded in step 
1. Create a show playlist with an LST-START clip followed by the desired test content (such 5.1 3-
band). Note that we have found that the red/green script trigger clips may not work with some 
laser projectors. If this is the case with your projector, use one of the other methods of starting 
a script as defined in Appendix A – Red/Green Flash Script Start.  

Содержание LSS-100P

Страница 1: ...181 Bonetti Dr San Luis Obispo CA 93401 USA Phone 1 805 549 0161 Fax 1 805 549 0163 LSS 100P Installation and Operation Manual...

Страница 2: ...erer Windows Version 20 Ethernet Device Discoverer iOS version 21 Ethernet Device Discoverer Android version 22 Ethernet Device TCP Based Operations 22 TCP_Send Command Usage 25 CP850 Control 26 Log P...

Страница 3: ...LSS 100P Installation Operation Manual v160817 3...

Страница 4: ...also include a white test pattern allowing the LSS 100P to measure peak luminance and chromaticity These values are limit checked logged and optionally posted to a remote web server for further analys...

Страница 5: ...LSS 100P Installation Operation Manual v160817 5...

Страница 6: ...Scripts are typically triggered using a red green flash sequence at the start of the test show As an alternative scripts may be started with a command over TCP or by a contact closure See Appendix A...

Страница 7: ...LSS 100P Installation Operation Manual v160817 7 Figure 1 LSS 100P Home Page Figure 2 LSS 100P Log...

Страница 8: ...ector of the POE Power Injector to a computer Apply AC power to the POE Power Injector 2 The green LED next to the Ethernet connector on the LSS 100P will light dimly for 30 seconds then light brightl...

Страница 9: ...l appear The Light Table section determines how the left side of the home page will appear the side that is showing luminance color etc The home page can show up to 7 rows of light information The sou...

Страница 10: ...rence columns may be defined 9 The LSS 100P determines the highest SPL it measured from midnight local time to midnight local time The highest value is logged each night at midnight You can set a limi...

Страница 11: ...as part of company or organization A particular LSS 100P can be uniquely identified by the OrgKey Theater Number and Screen Number The Distance of LSS 100P to Screen field is used when running the au...

Страница 12: ...es are used instead of host names these fields can be left at 0 0 0 0 The default 8 8 8 8 is a DNS service provided by Google After the network information has been entered click the Save Config butto...

Страница 13: ...ST PDT Mountain 7 0 MST MDT Central 6 0 CST CDT Eastern 5 0 EST EDT Figure 9 U S Time Zone Offsets 19 Enter the abbreviations for standard and advanced summer or daylight saving time Select whether da...

Страница 14: ...adjust the focus control until the red spots on the screen appear to be in focus As the LSS 100P is adjusted out of focus the hole in the middle of the spots fills in When the LSS 100P is in focus th...

Страница 15: ...ction of the Auditorium Data page see figure 6 Click the Save Settings button to scale the LSS 100P luminance measurement to match the reference meter You can click the Reset Luminance Scaling button...

Страница 16: ...speakers are run We suggest setting limits 3dB below and above the values measured on the test show Failures in the audio equipment will result in values outside this range Note that the limits set f...

Страница 17: ...un buttons located on the Command Script Definition page allow the user to manually trigger LSS 100P Command Scripts without having to run the corresponding DCP show normally used This may be useful w...

Страница 18: ...Click CSV to download the log as a comma separated value file for importing the data into a spreadsheet A portion of a typical download is shown below Figure 12 LSS 100P CSV Data Change the format of...

Страница 19: ...Time DST 1 width 100 height 700 iframe body html The iframe does a client side include of multiple web pages The attributes of the iframe tag are described below The seamless and frameborder 0 attribu...

Страница 20: ...e screen number If there is an out of limits log entry in the log record range specified the log link appears in red You don t have to look at logs from auditoriums where all is well Sample HTML is sh...

Страница 21: ...thernet Device Discoverer showing LSS 100P status in red Ethernet Device Discoverer iOS version An iOS version of Ethernet Device Discoverer is available at https itunes apple com us app ethernet disc...

Страница 22: ...before the carriage return The command is not echoed by the LSS 100P LSS 100P commands can be tested using Tera Term RealTerm both listed below or telnet on operating systems that include it Windows X...

Страница 23: ...ab lss100 sys xy 0 314743 t0 353419 Returns the chromaticity as x tab y lss100 sys capture_spl SPL Center Low 81 2 83 2 83 239520 Instructs the LSS 100P to capture the current SPL to its log The param...

Страница 24: ...t test_start command sent to the CP850 If it is omitted test_start commands will be sent to the same CP850 lss100 sys cp_850_test_stop Stops the test signal generation in the Dolby CP850 and returns i...

Страница 25: ...tures keeps the measurement capture synchronized with the test content Figure 19 LSS 100P TCP Commands TCP_Send Command Usage The tcp send command allows a user to have the LSS relay TCP strings to ot...

Страница 26: ..._850_test_stop A portion of a sample test script is shown below A particular speaker is selected the LSS 100P is given time for the SPL reading to stabilize the reading captured then the next speaker...

Страница 27: ...192 168 1 153 IpAddress Record Record RecordNum 997 RecordNum DateTime 1440661743 DateTime Description Log post response code Description Value 200 Value Units Units Minimum 0 Minimum Maximum 399 Maxi...

Страница 28: ...downloaded from http ftp uslinc com dir ftp Products LSS DB Hidden Screens The LSS 100P has a few hidden screens that are described below One shows the configuration data for the unit The other two a...

Страница 29: ...er the lens or by dowsing the projector and removing power from any IR panels in the auditorium Once the LSS 100P is presented with total darkness click the Save Dark Count button This sets a dark ref...

Страница 30: ...re is installed After the new code is uploaded to the LSS 100P the browser will return a Connection Reset message This happens when the LSS 100P reboots with the new firmware If a firmware update is i...

Страница 31: ...mands to the LSS 100P and see responses http ftp uslinc com dir ftp Products LSS 100P Software TestContent LST 100 Test DCP Use this digital cinema content for the DCP based operation of the LSS 100P...

Страница 32: ...P devices that have been installed in theaters will post the results of each test to a URL Uniform Resource Locator where the LSS DB collects the data The LSS Database provides a mechanism to collect...

Страница 33: ...ed a binary 0 A single ASCII character is sent using a sequence of red and green images The character is sent at 0 5 bits per second 2 seconds per bit The character consists of a start bit 0 8 data bi...

Страница 34: ...e script triggering is being used connect the supplied cable to the LSS 100P Connect the other end of the cable to the USB adapter board Refer to Figures 23 and 24 for wiring instructions If contact c...

Страница 35: ...in or pasted in Certain phases and words are hard coded into the LSS 100P in English The web interface replaces these phrases and words using javascript when the browser renders the web page The repla...

Страница 36: ...d by it will be free from defects in material and workmanship under normal usage over a period of one 1 year after its purchase new from and authorized dealer Our obligation under this warranty is lim...

Страница 37: ...ate hardware and firmware update 120217 4 Editorial revisions 120501 5 Add documentation on DCP based operation of the LSS 100P 130614 6 Add documentation on new hardware scripting etc 140604 A Added...

Отзывы: