PORTABLE LPV TREATER
Installation
Section
B
Incoming power connected to
these terminals in the Treater
Control Panel
1. If the treater does not come equipped with a generator, or you are
supplying your own generator, have a certified electrician provide
power to the seed treating system. The treater panel is the only
equipment that is hard wired (below). This will power the USC
LPV Seed treater and any attached conveyors. All other
equipment requires a properly grounded 110V source. Provide
convenient shutdown switches, comply with local electrical codes
and ensure that the system is properly grounded and bonded.
All USC control panels must be connected adhering to the same
electrical requirements as specified in the main control panel on
the power requirement tag (right), or the electrical schematic
shipped with the piece of equipment.
A minimum rating of 34 KW is required when using
a generator with the system.
NOTICE
HIGH VOLTAGE ~
Always disconnect the power source
before working on or near the control panel or lead wires.
HIGH VOLTAGE ~
Use insulated tools when making
adjustments while the controls are under power.