20
Visit us online at www.USWaterSystems.com Give us a call at: 1-800-608-8792
System Regeneration
14.
Install a new or rinsed used filter back in the filter sump and install the filter sump on the filter cap. Tight-
en it hand tight and an additional ¼ to ½ turn.
15.
After 30 mins of soak time, open the feed water valve and allow the system to rinse through the restrict-
ed regeneration valve.
16.
The 0.3 cu/ft unit will need to rinse for 15 mins and the 0.7 cu/ft unit will need to rinse for 25 mins.
17.
After rinsing for the specified time, close the regeneration valve and open a downstream point of use
and rinse for 5 more mins.
18.
Once the appropriate rinse time is completed, the system is now regenerated and ready for use