![US Water Systems 080-FSC-075 Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/us-water-systems/080-fsc-075/080-fsc-075_owners-manual_1063788021.webp)
21
Programming Instructions
Calendar Day Override setting: Al-
lows user to set a time to regener-
ate by if the unit hasn’t met its set
meter amount within that time pe-
riod.
Pressing the Regen button allows
you to change the days. Default
setting is 0 days, but can range
from 0-99 days. This should be
set to 14 days. If the system isn’t
in operation for more than two
weeks, this should be set to 10
days. Press the gear button to
save and exit the standard pro-
gramming mode. The unit is now
programmed and ready for use.
While in service position, hold the Regen button in for 5-6 second to initiate an
immediate regeneration.
Pressing the Regen button again will jump to the next cycle phase. Holding the
two arrow buttons together will terminate Immediate Regeneration and return
the unit to service position.
During a loss of power, all program settings will be stored in permanent
memory. The current valve position, cycle step and time of day are all stored
as well, but upon power up a reset of the current time will be necessary. If the
unit were to lose power during a regeneration stage, the valve will return back
to its prior position when the outage occurred.
The unit will take 4 -5 minutes to
reset back to that position.
Power Outage Memory
Immediate Regeneration
Содержание 080-FSC-075
Страница 23: ...23 Valve Body Assembly...