Área Industrial La Dehesa
Calle Dehesa Vieja, 2
28052 Madrid (España)
Tel. (+34) 918 021 649
Fax. (+34) 917 750 542
[email protected]
18
ecoline
www.masterbattery.es/en
UE-24Li2900WH
B. Power On
Double check all the power cable and communication cable, check the ADD switch.
(1) Switch the breaker between battery system and inverter.
(2) Switch power on
Switch on all the battery modules:
(3) The one connects communication cable to inverter is the
Master Battery
Module, others are slaves (1 master battery configure with
maximum 19 slave batteries).
(4) Press the Start Button (
SW
) of
master battery
to power on, all the battery LED light will be on after master battery starts.
ecoline