Área Industrial La Dehesa
Calle Dehesa Vieja, 2
28052 Madrid (España)
Tel. (+34) 918 021 649
Fax. (+34) 917 750 542
[email protected]
17
ecoline
www.masterbattery.es/en
UE-24Li2900WH
(1) Put the battery into the cabinet;
(2) Drive the 4 pcs screws;
(3) Connect the cables between battery modules. If use
(4) Connect the cables to inverter
The power cables’ current capacity is
120 A (peak)
. If the battery string’s current over this limit, must configure 2 pairs of external
power cables to reach
240 A
.
If nominal current of battery system is higher than 100 A, it is suggested to use 2 pairs of cables.
(5) There shall be a manual disconnecting device (breaker, etc.) between battery system and inverter.
CAN communication: