![UNMAK UKY/Y 100 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/unmak/uky-y-100/uky-y-100_user-manual_1059766004.webp)
P a g e
| 3
Hot Water Boiler with Steel Body, Automatic Fuel Feed Operation and Maintenance Manual
SHIPPING AND TRANSPORTATION
ÜNMAK solid fuel stocked boilers are manufactured from thick sheet. The boilers are packaged in
one piece. Boiler fans, boilers up to 60.000 kcal / h (including) Capacity are located in the material
box on the boiler.
1. Boiler Group: It is shipped with boiler insulation and outer jacket covered.
2. Accessories: Control panel, pump (pump for capacities under the boiler including 60.000 kcal / h
capacity), operating instructions with warranty certificate and boiler accessories are included in the
boiler package.
Safe transport of the product
Solid fuel boilers are heavy products, so care should be taken when transporting the boiler to the
place where it will be installed. The equipment used to lift and transport the product must therefore
be of sufficient capacity.
In order to prevent damage to the boiler's
outer
plates
and
the
boiler
during
transportation;
In small boilers, it must be ensured that the
hoisting rope does not damage the painted
thin sheets of the boiler and the reducer and
fan group under the hopper while carrying the
hoisting rope from the forklift stands on the
chassis and transporting the boiler with the
help of crane or hoist.
It is also convenient to remove the large cauldrons from the forklift stands or
the transport ring on the boiler. If the connection ropes are to be passed
under the boiler when lifting by crane, preventive action should be taken to
prevent the top of the boiler from being crushed by the ropes. Floor standing
crane must be lifted without crane. When transporting in cold weather, the
boiler should not be lifted suddenly in case of freezing of the rope from the
cold.
Pay attention to avoid damage to the gear unit and fan under the hopper during transport.
When removing the packaging around the boiler, hard and sharp objects should not be used
to prevent damage to the painted boiler plates under the packaging.